V-RC-2018060009
Service Bulletin Details
Public Details for: V-RC-2018060009
Spot welds on front side wall paneling.
Models from 9999
9999 MERCEDES-BENZ SPRINTER 906 |
Campaign No. 2018060009, June 2018 TO: ALL MERCEDES-BENZ CENTERS SUBJECT: Model 906 (Sprinter), Model Year 2017 Spot Welds on Front Side Wall Paneling Daimler AG (DAG), the manufacturer of Mercedes-Benz Vans, has determined that on certain Mercedes-Benz and Freightliner Sprinter vehicles, spot welds might be missing on the front side wall on the driver and/or the passenger side. The affected spot welds connect the door portal with the underlying hinge reinforcements behind. If the missing welds affect body strength, there may be an increased risk of injury in the event of a crash. An authorized Mercedes-Benz or Freightliner Sprinter dealer will check if any of the welds on the A-pillar are missing. If necessary, the affected vehicles will be reworked by setting the missing weld spots at the front side wall panelling. Prior to performing this Recall Campaign: • Please check VMI to determine if the vehicle is involved in the Campaign and if it has been previously repaired. • Please review the entire Recall Campaign bulletin and follow the repair procedure exactly as described. Please note that Recall Campaigns do not expire and may also be performed on a vehicle with a vehicle status indicator. Approximately 153 vehicles are involved. Order No. V-RC-2018060009 This bulletin has been created and maintained in accordance with MBUSA-SLP S423QH001, Document and Data Control, and MBUSA-SLP S424HH001, Control of Quality Records. Op. no. Operation text Time Damage Code Code 02 2508 Operations: Check spot welds on A-pillars --- 63 910 61 7 NC3BEPLANK 02 2509 Operations: Weld A-pillar ...... (after check) --- 63 910 61 7 NC3BEPLANK 02 2510 Operations: Weld 2 A-pillars (after check) --- 63 910 61 7 NC3BEPLANK 02 2594 Operations: Extra work for: Weld A-pillar ..... on vehicle --- 63 910 61 7 NC3BEPLANK with mud flap 85 9800 Carry out spot repair, location:..... --- 85 9802 Carry out spot repair (each remaining) on additional --- part, location:..... 1 A-pillar Check 1 Check whether vehicle is affected by measure For authorized Mercedes‑Benz service partners, only the entry in the "Extended VEGA Application" (EVA) system, in the "Current" tab is decisive. An additional test of the affected vehicles in the workshop information system (WIS) or vehicle list is thereby not necessary. 2 Check whether spot welds (arrows) are present on A-pillar (1). Check A-pillars (1) on driver and front passenger side. Clean A-pillars (1) before visual check with a rag. If spot welds (arrows) are present, ↓ end the measure. If no spot welds (arrows) are present, ↓ continue with operation step 3. Remove 3 Remove respective front door. 4 Remove respective fender. 5 Cover all detachable parts remaining in vehicle with welding protection blankets. Install Danger The high voltage used for electric welding presents Use insulating mats. Wear protective clothing, safety a lethal hazard. Risk of explosion from welding in glasses and a protective mask. Remove highly areas close to highly inflammable materials. Risk inflammable materials from the hazard area. Use air of injury from weld splatter and UV-light when extraction system. welding. Risk of poisoning from inhaling welding gases Caution 6 Topical note Risk of injury caused by scraping or cutting body parts on sharp vehicle parts Weld affected A-pillar (1) subsequently. Measures for preventing damage to vehicles or components when performing electric welding work 000 588 02 84 00 Welder 7 Remove welding protection blankets. Always wear protective gloves when working on or near sharp and non-deburred vehicle parts. Deburr repair panels. 8 Clean repair area. Danger Risk of explosion caused by paint vapors igniting. No smoking! No open fire! Use respiratory protection, Risk of poisoning caused by inhaling paint protective clothing, gloves, safety glasses and vapors. protective skin cream. Ensure that the area is well ventilated. 9 Prime repair area with a primer filler. Topical note Notes on paintwork repairs Apply spot repair. Use only primer filler approved by Daimler AG: http://xentryportal.mercedesbenz.com Danger Risk of explosion caused by paint vapors igniting. No smoking! No open fire! Use respiratory protection, Risk of poisoning caused by inhaling paint protective clothing, gloves, safety glasses and vapors. protective skin cream. Ensure that the area is well ventilated. 10 Paint repair area and adjacent surfaces. Topical note Notes on paintwork repairs Apply spot repair. Use only paints approved by Daimler AG: http://xentryportal.mercedesbenz.com 11 Supplement cavity preservation 12 Install respective fender. 13 Install respective front door. Danger The high voltage used for electric welding presents Use insulating mats. Wear protective clothing, safety a lethal hazard. Risk of explosion from welding in glasses and a protective mask. Remove highly areas close to highly inflammable materials. Risk of inflammable materials from the hazard area. Use air extraction system. injury from weld splatter and UV-light when welding. Risk of poisoning from inhaling welding gases Caution Risk of injury caused by scraping or cutting body Always wear protective gloves when working on or parts on sharp vehicle parts near sharp and non-deburred vehicle parts. Deburr repair panels. Topical note Measures for preventing damage to vehicles or components when performing electric welding work The following steps are shown on the left side of the vehicle and must be performed analogously on the right side in the event of a problem. a Dimension (9 mm) 1 b Dimension (12 mm) c Dimension (9 mm) d Dimension (15 mm) i Observe dimensions (a, b, c, d). The Use spot-weld cutter to cut holes on edges of the hinge holder (2) act here as Apillar outer section (1) next to lower reference edges. hinge holder (2) of front door (areas A 1 and A 2 ). Never cut through 2 panel thicknesses. 2 Otherwise, inert gas plug welding will no Grind A-pillar outer section (1) down to bare metal around the holes (areas A 1 longer be possible. and A 2 ). 3 Cut through one panel thickness only. 4 A-pillar outer section (1) (area B). 5 Grind inert gas plug welds down to bare metal (area B). 6 Remove shavings. Remove shavings and milling chips.