This is a representative communication sent to multiple oems from cummins regarding an issue of oil weeping from the pipe plug in the lubricating oil filter head due to an ovality in the threads.


- 9999 -

Models from 9999
9999 CUMMINS L9
From: Joshua M
Sent: Thursday, May 30, 2019 3:57 PM
To: John A
; Lessie O
; Robert T
; Everette L
; Steve R
;
Kammara A
; Sonya E
; Luis

Cc: Justin-Ray S
; Walt H
; Tommy

Subject: Lube Filterhead Pipe Plugs to be Torqued
Team,
Per our discussion earlier, we need to arrange to have technicians overcheck the lube filterhead pipe
plugs to 85 Nm for any engines on this list that are still at the OEM locations that are older than the
clean point ESNF that we have recorded. Engines that have already been put into application will be
covered by the TSB.
We will need to go after the customers highlighted in yellow in the attached file. The ESNs are
broken out that are impacted for each customer. Please let us know if you have any questions.
Regards,
Josh
Customer Quality Assurance Manager
Cummins Inc.
Rocky Mount Engine Plant
joshua.
@cummins.com
Cell: (252)
Updated: 05/29/2019
BACKGROUND
• Plant technicians reported finding oil weeping from the pipe plug in the
lubricating oil filter head, EBU P/N 5450366.
• Lubricating oil filter head P/N 3974326 was changed to lubricating oil
filter head P/N 5450366.
STATUS:
ESCALATION:
Completed
• Existing Torque process of the pipe plug was validated.
• A DC Sensor tool is used to torque the plug to 45 Nm
• A torque overcheck is performed at a subsequent station
• Initial Step 3 implemented to apply Loctite 565 to the plug and
increase torque to 55 Nm and all inventory at RMEP reworked.
• ESN First - 74503910
FAULT CODE/FAIL MODE
• Oil weeping from the lubricating oil filter pipe plug.
CURRENT STATE
• Root cause identified and containment completed at RMEP.
• Containment is being initiated at OEM plants.
ROOT CAUSE AND GOAL STATEMENT
• Manufacturing process changed from a drilling, taper reaming,
and ¾ NPTF tapping process to a ¾ NPTF thread milling.
• ¾ NPTF thread milling process has introduced ovality which can
create a leak path.
• 100% black-light assisted leak inspection implemented post hot test.
• ESN First - 74506743
• Additional torque validated and deviation issued to raise torque to
85Nm
• ESN First - 74510923
• 85 Nm torque increase validated as Step 3 fix for units at the OEM.
• CAR issued to engineering to update the print to change the hole
callout to S2 from S1.
• Supplier reverted to drilling, taper reaming, and ¾ NPTF tapping.
(30 pc validation parts in transit to RMEP)
NEXT STEPS
• Work with onsite plant technicians to identify suspect engines
still at the OEM plants.
• Rework units at OEM plants with increased torque (85 Nm).
• Release TSB documenting increased torque requirement for
units in the field.
1


© dot.report 2024

Use of this information constitutes acceptance for use in an AS IS condition. There are NO warranties, implied or otherwise, with regard to this information or its use. Any use of this information is at the user's risk. It is the responsibility of user to evaluate the accuracy, completeness or usefulness of any information, opinion, advice or other content. EACH USER WILL BE SOLELY RESPONSIBLE FOR ANY consequences of his or her direct or indirect use of this web site. ALL WARRANTIES OF ANY KIND ARE EXPRESSLY DISCLAIMED. This site will NOT BE LIABLE FOR ANY DIRECT, INDIRECT or any other kind of loss.