PM963 2020 Kicks
Service Bulletin Details
Public Details for: PM963 2020 Kicks
Continuously variable transmission (cvt) replacement dealer announcement: nissan is conducting a dealer inventory quality action to replace the continuously variable transmission (cvt) on nine (9) 2020 nissan kicks vehicles and two (2
- 2020 -
Models from 2020
2020 NISSAN KICKS |
2020 NISSAN VERSA |
| PM963 | Original Document PM963- 2020 KICKS/VERSA CVT REPLACEMENT SERVICE PROCEDURE: NOTE: It is NOT necessary to contact Powertrain Call Center (PCC) for approval. A VCAN is not required. For KICKS: 1. Replace the CVT Assembly per the ESM: TRANSMISSION & DRIVELINE > CVT: RE0F11B > UNIT REMOVAL AND INSTALLATION, TRANSMISSION ASSEMBLY > Removal and Installation. 2. Also follow Inspection & Adjustment Before and After Installation ESM: TRANSMISSION & DRIVELINE > TRANSAXLE & TRANSMISION > CVT: RE0F11B > UNIT REMOVAL AND INSTALLATION, TRANSMISSION ASSEMBLY > Inspection and Adjustment. Using the ESM procedure, follow all Warnings, Cautions, Notes and Torque requirements during the Removal and Installation procedure. WARNING: Do not remove the coolant reservoir tank cap when the engine is hot. Serious burns could occur from high pressure engine coolant escaping from the reservoir tank. Wrap a thick cloth around the cap. Slowly turn it a quarter turn to allow built-up pressure to escape. Carefully remove the cap by turning it all the way. CAUTION: Perform these steps after the coolant temperature has cooled sufficiently. When replacing transaxle assembly, perform “ADDITIONAL SERVICE WHEN REPLACING TRANSAXLE ASSEMBLY”. NOTE: When removing components such as hoses, tubes/lines, etc., cap or plug openings to prevent fluid from spilling. *These CVTs will be placed on parts return back to the Field Quality Center. Please direct the parts attention to “FQA” while following the standard campaign parts return process. 1/4 For VERSA: 1. Replace the CVT Assembly per the ESM: TRANSMISSION & DRIVELINE > TRANSAXLE & TRANSMISSION > CVT: RE0F11B > UNIT REMOVAL AND INSTALLATION, TRANSMISSION ASSEMBLY > Removal and Installation. 2. Also follow Inspection & Adjustment Before and After Installation ESM: TRANSMISSION & DRIVELINE > TRANSAXLE & TRANSMISION > CVT: RE0F11B > UNIT REMOVAL AND INSTALLATION, TRANSMISSION ASSEMBLY > Inspection and Adjustment. Using the ESM procedure, follow all Warnings, Cautions, Notes and Torque requirements during the Removal and Installation procedure. WARNING: Do not remove the coolant reservoir tank cap when the engine is hot. Serious burns could occur from high pressure engine coolant escaping from the reservoir tank. Wrap a thick cloth around the cap. Slowly turn it a quarter turn to allow built-up pressure to escape. Carefully remove the cap by turning it all the way. CAUTION: Perform these steps after the coolant temperature has cooled sufficiently. When replacing transaxle assembly, perform “ADDITIONAL SERVICE WHEN REPLACING TRANSAXLE ASSEMBLY”. NOTE: When removing components such as hoses, tubes/lines, etc., cap or plug openings to prevent fluid from spilling. *These CVTs will be placed on parts return back to the Field Quality Center. Please direct the parts attention to “FQA” while following the standard campaign parts return process. 2/4 PARTS INFORMATION: Description Part # Quantity AUTOMATIC TRANSAXLE 31020-50X5A 1 NUT 01223-00231 4 NUT 01225-N0011 2 NUT 01225-N2011 2 WASHER DRAIN 11026-JA00A 1 GASKET-INTAKE MANIFOLD 14035-5RL0A 1 GASKET-INTAKE MANIFOLD 16175-5RB0A 1 CLAMP 16439-7S01E 2 NUT-FIX, EXHAUST TUBE 20602-9U20B 2 GASKET-EXHAUST 20691-19B0A 1 GASKET-EXHAUST 20692-1HA0A 1 SEAL-O RING 31084-3Z000 1 PIN-COTTER 40073-0L700 2 NUT-LOCK, FRONT WHEEL B 40262-4M400 2 NUT 54588-1HA0C 4 NS-3 CVT FLUID 999MPCV0NS3 12 NISSAN LONG LIFE COOLANT BLUE 999MPL25500P 3 3/4 CLAIMS INFORMATION Submit claim using the following claims coding: Work Order Line Type: “CM” Campaign Campaign: PM963 Claim Type: CM PNC: PM963 Symptom: ZZ Diagnosis: 99 Op Codes Flat Rate Time Parts Required on claim Expense Code Required Replace CVT Assembly (Versa) PM9630 7.5 Hr Yes NO Replace CVT Assembly (KICKS) PM9631 7.3 Hr YES NO Description: 4/4