PM963 2020 Kicks

Service Bulletin Details

Public Details for: PM963 2020 Kicks

Continuously variable transmission (cvt) replacement dealer announcement: nissan is conducting a dealer inventory quality action to replace the continuously variable transmission (cvt) on nine (9) 2020 nissan kicks vehicles and two (2


- 2020 -






|

PM963 | Original Document
PM963- 2020 KICKS/VERSA
CVT REPLACEMENT
SERVICE PROCEDURE:
NOTE: It is NOT necessary to contact Powertrain Call Center (PCC) for approval. A
VCAN is not required.
For KICKS:
1. Replace the CVT Assembly per the ESM: TRANSMISSION & DRIVELINE > CVT:
RE0F11B > UNIT REMOVAL AND INSTALLATION, TRANSMISSION ASSEMBLY >
Removal and Installation.
2. Also follow Inspection & Adjustment Before and After Installation ESM:
TRANSMISSION & DRIVELINE > TRANSAXLE & TRANSMISION > CVT: RE0F11B >
UNIT REMOVAL AND INSTALLATION, TRANSMISSION ASSEMBLY > Inspection and
Adjustment.

Using the ESM procedure, follow all Warnings, Cautions, Notes and Torque
requirements during the Removal and Installation procedure.
WARNING: Do not remove the coolant reservoir tank cap when the engine is hot.
Serious burns could occur from high pressure engine coolant escaping from the
reservoir tank. Wrap a thick cloth around the cap. Slowly turn it a quarter turn to
allow built-up pressure to escape. Carefully remove the cap by turning it all the way.
CAUTION:
 Perform these steps after the coolant temperature has cooled sufficiently.
 When replacing transaxle assembly, perform “ADDITIONAL SERVICE WHEN
REPLACING TRANSAXLE ASSEMBLY”.
NOTE: When removing components such as hoses, tubes/lines, etc., cap or plug
openings to prevent fluid from spilling.
*These CVTs will be placed on parts return back to the Field Quality Center.
Please direct the parts attention to “FQA” while following the standard
campaign parts return process.
1/4
For VERSA:
1. Replace the CVT Assembly per the ESM: TRANSMISSION & DRIVELINE >
TRANSAXLE & TRANSMISSION > CVT: RE0F11B > UNIT REMOVAL AND
INSTALLATION, TRANSMISSION ASSEMBLY > Removal and Installation.
2. Also follow Inspection & Adjustment Before and After Installation ESM:
TRANSMISSION & DRIVELINE > TRANSAXLE & TRANSMISION > CVT: RE0F11B
> UNIT REMOVAL AND INSTALLATION, TRANSMISSION ASSEMBLY > Inspection
and Adjustment.
 Using the ESM procedure, follow all Warnings, Cautions, Notes and
Torque requirements during the Removal and Installation procedure.
WARNING: Do not remove the coolant reservoir tank cap when the engine is hot.
Serious burns could occur from high pressure engine coolant escaping from the
reservoir tank. Wrap a thick cloth around the cap. Slowly turn it a quarter turn to
allow built-up pressure to escape. Carefully remove the cap by turning it all the way.
CAUTION:
 Perform these steps after the coolant temperature has cooled sufficiently.
 When replacing transaxle assembly, perform “ADDITIONAL SERVICE WHEN
REPLACING TRANSAXLE ASSEMBLY”.
NOTE: When removing components such as hoses, tubes/lines, etc., cap or plug
openings to prevent fluid from spilling.
*These CVTs will be placed on parts return back to the Field Quality Center.
Please direct the parts attention to “FQA” while following the standard
campaign parts return process.
2/4
PARTS INFORMATION:
Description
Part #
Quantity
AUTOMATIC TRANSAXLE
31020-50X5A
1
NUT
01223-00231
4
NUT
01225-N0011
2
NUT
01225-N2011
2
WASHER DRAIN
11026-JA00A
1
GASKET-INTAKE MANIFOLD
14035-5RL0A
1
GASKET-INTAKE MANIFOLD
16175-5RB0A
1
CLAMP
16439-7S01E
2
NUT-FIX, EXHAUST TUBE
20602-9U20B
2
GASKET-EXHAUST
20691-19B0A
1
GASKET-EXHAUST
20692-1HA0A
1
SEAL-O RING
31084-3Z000
1
PIN-COTTER
40073-0L700
2
NUT-LOCK, FRONT WHEEL B
40262-4M400
2
NUT
54588-1HA0C
4
NS-3 CVT FLUID
999MPCV0NS3
12
NISSAN LONG LIFE
COOLANT BLUE
999MPL25500P
3
3/4
CLAIMS INFORMATION
Submit claim using the following claims coding:
Work Order Line Type: “CM” Campaign
Campaign: PM963
Claim Type:
CM
PNC:
PM963
Symptom:
ZZ
Diagnosis:
99
Op
Codes
Flat
Rate
Time
Parts
Required
on claim
Expense
Code
Required
Replace CVT Assembly (Versa)
PM9630
7.5 Hr
Yes
NO
Replace CVT Assembly (KICKS)
PM9631
7.3 Hr
YES
NO
Description:
4/4


© dot.report 2024

Use of this information constitutes acceptance for use in an AS IS condition. There are NO warranties, implied or otherwise, with regard to this information or its use. Any use of this information is at the user's risk. It is the responsibility of user to evaluate the accuracy, completeness or usefulness of any information, opinion, advice or other content. EACH USER WILL BE SOLELY RESPONSIBLE FOR ANY consequences of his or her direct or indirect use of this web site. ALL WARRANTIES OF ANY KIND ARE EXPRESSLY DISCLAIMED. This site will NOT BE LIABLE FOR ANY DIRECT, INDIRECT or any other kind of loss.