FT5239
Service Bulletin Details
Public Details for: FT5239
Spheros maintenance access
- 2020 -
Models from 2020
2020 NOVA BUS LFS |
2020 NOVA BUS LFS ARTIC |
FT5239 CATA Spheros Maintenance Access (MQR 7621-2232) Technical writer name / nom rédacteur technique: André Pelletier Parts/ pièces, description HOSE ASSEMBLY 801 PUSH-LOK BRACKET MOUNT FIR TREE CABLE TIE NUT LOCKNYL FL M6 ZP SCREW M6X25 H YZ TRIV 96H 8.8 Part # / # de QTY / pièce Qté N95835-10 N13876 N57807 N38593 N44881-02 Manual/manuel, section: Labour level 1 / main d'oeuvre niveau 1 Order LD34 LD35 MQR 1 2 2232 2 Disposal of parts / disposition des pièces Removed parts are / les pièces retirées sont: When the retained check box is check, the parts must be retained and returned in accordance with the usual warranty procedure to be reimbursed Retained/conservé / Pour être remboursées, les pièces doivent être conservées et retournées selon le processus de garantie habituel. Discarded / jetées Road numbers 719 730 6016 6018 L82J8L9777730 S92J3L9777742 VIN L82J2L9777741 S92J7L9777744 QTY 12 3 NR x x Jean-Nicolas Fournier NQF772004 Version2 7621- 1 1 x Client Capital Area Transportation Authority Michigan - CATA Capital Area Transportation Authority Michigan - CATA 1h 14 R1 Digitally signed by Jean-Nicolas Fournier DN: cn=Jean-Nicolas Fournier, o=Nova Bus, [email protected], c=CA Date: 2022.04.04 10:49:30 -04'00' WARNING : Follow your internal safety procedures. A) VEHICLE PREPARATION STEPS: 1. 2. 3. 4. Park the vehicle on an even surface with transmission on neutral (N) and apply the parking brake. Set the Master Control Switch in STOP position (see figure 1). Before starting any work on the vehicle, make sure that the vehicle is completely and securely stationary. Place the battery disconnect switch in OFF position in the batter y compartment. Figure 1 – Master Control Switch in STOP Position DQT, CONFIDENTIAL Date created: Latest update: MQR-7621-2232: Field Installation Instructions Bill Of Materials Item 1 2 3 4 5 DQT, CONFIDENTIAL Date created: Latest update: Part # N95835-10 N103876 N57807 N38593 N44881-02 QTY 1 1 1 2 2 Units PC PC PC PC PC Description HOSE ASSEMBLY 801 PUSH-LOK BRACKET MOUNT FIR TREE CABLE TIE NUT LOCKNYL FL M6 ZP SCREW M6X25 H YZ TRIV 96H 8.8 MQR-7621-2232: Field Installation Instructions Work Instructions Description of Work: 1) 2) The existing hose will have its routing modified with an additional bracket to secure its position to avoid contact with the dust pan. A new hose (longer) will be installed to allow the auxiliary heater to swivel properly during maintenance. Note: See slides 8-9 for NPT fittings installation guidelines. 1 DQT, CONFIDENTIAL Date created: Latest update: 2 MQR-7621-2232: Field Installation Instructions Work Instructions 1) 2) 3) 4) Lift the bus and open (or remove) the dust pan to gain access to the auxiliary heater. Shut off the valve on the fuel filter. Cut the tie-wrap on the long hose and move it out of the way. Remove the short hose and replace with the new hose N95835-10, following the routing shown below. Make sure to leave an appropriate distance relative to the compressor plates. 5) Route the beginning of the hose at a 20 degree angle upwards. See slide 8. 6) Secure with a tie-wrap in the existing mount on the structure. Torque auxiliary heater side fittings to 15Nm. 4 20° 4 DQT, CONFIDENTIAL Date created: Latest update: 3 MQR-7621-2232: Field Installation Instructions Work Instructions 5) Loosen the fittings on the longer hose and install new bracket N103876 on the auxiliary heater cradle. Use new hardware N44881-02 and N38593 to secure the bracket. 6) Install tie mount N57807 on the bracket to orient and route the longer hose. 7) Torque auxiliary heater side fittings to 15Nm. 8) Test to ensure the pivoting of the auxiliary heater cradle works well. 9) Close the pivot. Open the valve on the fuel filter and close all compartments. 6 5 DQT, CONFIDENTIAL Date created: Latest update: MQR-7621-2232: Field Installation Instructions Work Instructions 20° Route hose 20° upwards (or as needed) to avoid contact with the nuts. DQT, CONFIDENTIAL Date created: Latest update: MQR-7621-2232: Field Installation Instructions Work Instructions 10) To purge the air from the fuel lines, connect the service tool through the datalink at the rear run box. 11) Start the marine pump, start the heater and monitor. *It may require 2-3 cycles to purge the air from the fuel filter and lines before ignition. Monitor through 1 complete heat cycle (180F). DQT, CONFIDENTIAL Date created: Latest update: MQR-7621-2232: Field Installation Instructions Work Instructions DQT, CONFIDENTIAL Date created: Latest update: MQR-7621-2232: Field Installation Instructions Work Instructions DQT, CONFIDENTIAL Date created: Latest update: