BS5283E
Service Bulletin Details
Public Details for: BS5283E
Roof fairing bracket cracking. New improve roof fairing bracket available for service.
- 2020 -
Models from 2020
2020 NOVA BUS LFS |
BS5283E SERVICE BULLETIN REFERENCE: Nova Bus Manuals SECTION: 01: Body RS NO: MQR 7621-2373 APPLICATION DEADLINE: 2023AU25 CLAIM REFERENCE NUMBER: WB-5283 EFFECTIVE IN PROD.: LE16 (2022MR) SUBJECT: Roof Fairing Brackets Cracking. JUSTIFICATION: Introduction of a new roof fairing bracket LEVEL 1 DIRECT CHARGES DESCRIPTION Replace the original brackets with the newer brackets 2 TIME LABOUR MATERIAL Nova Bus Nova Bus 20min – – – – MATERIAL REQUIRED PER VEHICLE QTY PART NO REV. DESCRIPTION 1 N106339-1 – Roof Fairing Bracket, Left Side 1 N106339-2 – Roof Fairing Bracket, Left Side 4 N78307 A Screw 1/4X3/4 Cap Hex FL SS18-8 4 N44884-01 D Screw M6X20 FL SSA2 C70 D6921 4 N28219 A Washer Flat M8 Oversize SS – – – – Threadlocker Loctite 243 (cartridge of 50 ml) LEVEL 1 LEVEL 2 – LEVEL 1 SHOP SUPPLY 8 ml N97665 Materials will be available within 39 days once your order has been placed. To order, please contact [email protected] Or by phone for USA 1-877-999-8808 Specify document number, quantity of parts required and shipping address. DISPOSAL OF PARTS REMOVED PARTS ARE: DISCARDED * RETAINED Yes – * Dispose of the unused parts and the defective parts in accordance with local environmental standards in effect. REVISION HISTORY REV. DATE NR 2022JL14 APPROVED BY: NQF772001 VERSION 3 CHANGE DESCRIPTION Initial release Jean-Nicolas Fournier WRITTEN BY Devanand Digitally signed by Jean-Nicolas Fournier DN: cn=Jean-Nicolas Fournier, o=Nova Bus, [email protected], c=CA Date: 2022.07.14 07:38:47 -04'00' PAGE 1 OF 5 SERVICE BULLETIN CLIENT ORDER ROAD NUMBER BS5283E VIN (2NVY/4RKY...) FROM TO FROM TO QTY Demo - Method Bus BAE LC87 — — L82L5L9777539 L82L5L9777539 1 New York City Transit New York - NYCT LC78 9620 — L82L4L9777581 L82L6L9777582 2 PAGE 2 OF 5 NQF772001 VERSION 3 SERVICE BULLETIN BS5283E WARNING FOLLOW YOUR INTERNAL SAFETY PROCEDURES. PROCEDURE 1.1. Park the vehicle on an even surface with the transmission on neutral. 1.2. Apply the parking brake and set the master control switch to the stop position. 1.3. Set the battery disconnect switch in the battery compartment to the off position. WARNING This vehicle contains an electrochemical power storage device and high-voltage cables that can cause serious, even fatal, physical harm from electric shock or chemical burns. It is the customer’s responsibility to read the manufacturer’s documentation and to be aware of the risks associated with the system. See your manual section 10: BAE Hybrid Propulsion System. Failure to comply with these instructions and electrical safety measures may result in injury or death, as well as severe damage to the vehicle. 1.4. Remove the original roof fairing bracket (see figure 1). 1.5. Install the new bracket and hardware (see figure 2). 1.6. Apply thread locker N97665 or equivalent.Torque to 6 lb-ft (8 N•m). 1.7. Repeat for the other side. 1.8. Return the bus to service. PAGE 3 OF 5 NQF772001 VERSION 3 SERVICE BULLETIN BS5283E Figure 1 - Bracket Location (Typical on Both Side) PAGE 4 OF 5 NQF772001 VERSION 3 SERVICE BULLETIN BS5283E Apply thread locker N97665 or equivalent. Torque to 6 lb-ft (8 N•m). Apply thread locker N97665 or equivalent. Torque to 6 lb-ft (8 N•m). Screw N78307 Screw N44884-01 Washer N28219 Figure 2 - New Bracket Installation (Typical on Both Side) PAGE 5 OF 5 NQF772001 VERSION 3