No. 22-24-5
Service Bulletin Details
Public Details for: No. 22-24-5
Technical information for wrb6 - replacing gateway control unit
Models from 2024
Models from 2023
Service Technical Information 22/24 ENU WRB6 9 WRB6 - Replacing Gateway Control Unit (Stop Delivery) Model Line: Panamera (971) Model Year: As of 2023 up to 2024 Country / Market: USA (C02), Puerto Rico (C0A), Canada (C36) Concerns: Gateway control unit Cause: A gateway control unit that does not meet the required market-specific requirements was installed in the affected vehicles. Action: Replace the gateway control unit. Affected Vehicles: Information Every vehicle is assigned to exactly one campaign scope. To find out the scope assigned to the relevant vehicle, see PCSS Vehicle Information. Only vehicles assigned to the campaign (see also PCSS Vehicle Information). AfterSales Feb 23, 2024 Page 1 of 3 9 Service WRB6 ENU Technical Information 22/24 Installation Position: Installation position of gateway control unit Required parts The part numbers of the required parts for the respective vehicle can be seen in the assigned scope. For an overview of the campaign scopes, see: Technical Information 'Warranty processing' Required tool • • • • Battery charger with a current rating of at least 90 A, e.g., VAS 5908 - battery charger 90 A P90999 - PIWIS Tester 4 Torque wrench, 2–10 Nm (1.5–7.5 ftlb.), e.g., V.A.G 1783 - torque wrench, 2–10 Nm (1.5–7.5 ftlb.) Torque wrench, 6 – 50 Nm (4.5 – 37 ftlb.), e.g., V.A.G 1331A - Torque wrench, 6-50 Nm (4.5-37 ftlb.) Replacing gateway control unit Work Procedure: 1 2 Feb 23, 2024 Page 2 of 3 Replace the gateway control unit. For procedure, see: Workshop Manual '903519 Removing and installing gateway control unit' Workshop Manual '903555 Replacing gateway control unit' Enter the campaign in the Warranty and Maintenance logbook. AfterSales Service Technical Information 22/24 ENU WRB6 9 Warranty processing Information The specified labor times were determined specifically for carrying out this campaign and include all necessary preliminary and subsequent rework. The labor times may differ from the Labor times published in the Labor Operation List in PCSS. Scope 1-4: Not relevant for this vehicle type. Scope 5: Replacing gateway control unit Labor time: Replacing gateway control unit Includes: Removing and installing the left front seat. Removing and installing footrest Removing and installing the left rear inner door sill trim. Removing and installing lower part of left B-pillar trim panel Coding gateway control unit Labor time: 199 TU Required parts: 80C907468F Gateway control unit 1 piece 9A700748300 M10 x 28 external hexagon head round bolt 4 pieces 9A700791500 Hexagon-head bolt 1 piece Damage Code WRB6 066 000 2 Important Notice: Technical Bulletins issued by Porsche Cars North America, Inc. are intended only for use by professional automotive technicians who have attended Porsche service training courses. They are written to inform those technicians of conditions that may occur on some Porsche vehicles, or to provide information that could assist in the proper servicing of a vehicle. Porsche special tools may be necessary in order to perform certain operations identified in these bulletins. Use of tools and procedures other than those Porsche recommends in these bulletins may be detrimental to the safe operation of your vehicle, and may endanger the people working on it. Properly trained Porsche technicians have the equipment, tools, safety instructions, and know-how to do the job properly and safely. Part numbers listed in these bulletins are for reference only. The work procedures updated electronically in the Porsche PIWIS diagnostic and testing device take precedence and, in the event of a discrepancy, the work procedures in the PIWIS Tester are the ones that must be followed. © 2024 Porsche Cars North America, Inc. AfterSales Feb 23, 2024 Page 3 of 3