S-SB-0032-13

Service Bulletin Details

Public Details for: S-SB-0032-13

Summary to be provided on a future date.


- 2013 - 2012 -

Models from 2013
2013 SCION IQ
Models from 2012
2012 SCION IQ
J
Tec hni cal Service Bulleti n
e ~C:ICJll
August20,2013
S-SB-0032-13
Engine Rattle/Noise on Cold Start-Up
Service
Category
Engine/Hybrid System
Section
Engine Mechanical
Market
Scion Supports ~
ASE Certi fication~
USA
Applicability
YEAR(S)
MODEL(S)
2012-2013
iQ
ADDITIONAL INFORMATION
Introduction
Some 2012- 2013 model yea r iQ vehicles may exhibit one or more of the following conditions:
• Rattle type noise for fi rst couple minutes following a cold start
• Excessive combustion chamber carbon build-up
• Idle speed momentarily drops to 500 rpm after a cold start
Follow the repair procedure in this bulletin to address these cond itions.
Production Change Information
This bulletin applies to vehicles produced BEFORE the Production Change Effective VIN shown
below.
MODEL
PLANT
DRIVETRAIN
PRODUCTION CHANGE EFFECTIVE VIN
iQ
Takaoka
CVT
JTNJJXBO#DJ025093
Warranty Information
OP CODE
DESCRIPTION
TIME
OFP
T1
T2
EG1310
R & R Piston Sub-assembly with Pin (ALL),
Piston Ring Set, and Oil Jets
15.6
13101-47021
91
43
APPLICABLE WARRANTY
• Thi s repair is covered under the Toyota Powertrain Warranty. This warranty is in effect for 60
months or 60,000 miles, whichever occurs first, from the vehicle's in-service date .
• Warranty application is limited to occurrence of the specified condition described in this
bulletin .
© 2013 Toyota Motor Sales, USA
Page 1 of 4
t
S-SB-0032-13
August 20, 2013
Page 2 of 4
Engine Rattle/Noise on Cold Start-Up
Parts Information
PART NUMBER
PART NAME
QTY
1301 1-47032
Ring Set, Piston*
1
13101-47020
13101-47021
13101-47022
Piston Sub-assy, w/Pin
4
15708-47040
15708-47031
Nozzle Sub-assy, Oil, No.1
4
PREVIOUS
NEW
13011-47030
13011-47031
* Parts listed are sets in quantities of 4, only order 1 of each .
Required Tools & Equipment
TOOLS & MATERIAL
QTY
FIPG Sealant: Three Bond 12078 , or Equivalent
As Needed
Piston Ring Expan der
1
Piston Ring Compressor
1
Torque Wrench
1
SPECIAL SERVICE TOOLS (SST)
Piston Pin Press*
PART NUMBER
QTY
09221-25026
1
* Essential SST.
NOTE
Additional SSTs may be ordered by c alling 1-800-933-8335.
Repair Procedure
1. Confirm condition as described in the Introduction.
2. Remove engine assembly.
Refer to the Technical Information System (TIS), applicable model and model year Repair
Manual:
•
2012 I 2013 iQ:
Engine/Hybrid System - Engine Mechanical - "1 NR-FE Engine Mechanical: Engine
Unit: Removal"
© 2013 Toyota Motor Sales, USA
S-SB-0032-13
Page 3 of 4
August 20, 2013
Engine Rattle/Noise on Cold Start-Up
Repair Procedure (Continued)
3. Disassemble engine assembly to gain access to the short block.
Refer to TIS , applicable model and model year Repair Manual:
• 2012 I 2013 iQ:
Engine/Hybrid System - Engine Mechanical - "1NR-FE Engine Mechanical: Engine
Unit: Disassembly"
HINT
ONLY disassemble wh at is necessary for the parts being repl aced.
4 . Disassemble short block.
Refer to TIS, applicable model and model year Repair Manual:
•
2012 I 2013 iQ:
Engine/Hybrid System - Engine Mechanical - "1NR-FE Engine Mechanical: Cylinder
Block: Disassembly"
5. Remove carbon deposits from all areas of combustion chamber, including cylinder head and
short block.
6. Replace the Pistons, Piston Ring set, and Oil Jets w ith updated parts.
NOTICE
B e s ure to follow Figures 1 and 2 closely for proper ring inst allation and gap orientation.
Figure 1. Ring Identification
6\~l
~
7@
©
Piston Ring Expander
4
Lower Side Rail
2
Upper Side Rail
5
No. 2 Ring
3
Oil Ring
6
No. 1 Ring
1
© 2013 Toyota Motor Sales, USA
S-SB-0032-13
Augu st 20, 201 3
Page 4 of 4
Engine Rattle/Noise on Cold Start-Up
Repair Proced ure (Continued)
Figure 2. Ring Alignment
1
Lower Side Rail
2
Upper Side Rail
3
No. 1 Ring
4
Oil Ring Expander
5
Front Mark
6
No. 2 Ring
7. Reassemble short block.
Refer to T IS, applicable model and model year Repair Manual:
• 2012 I 2013 iQ:
Engine/ Hybrid System - Engine Mechanical - "1NR-FE Engine Mechanical: Cylinder
Block: Reassembly"
8. Reasse mble and install engine assembly.
Refer to TIS, applicable model and model year Repair Manual:
• 2012 I 2013 iQ:
Engine/ Hybrid System - Engine Mechanical - "1 NR-FE Engine Mechanical: Engine
Unit: Reassembly"
• 2012 I 2013 iQ:
Engine/Hybrid System - Engine Mechanical - "1NR-FE Engine Mechanical: Engine
Unit: Installation"
9. Confirm repair.
© 2013 Toyota Motor Sales, USA


© dot.report 2024

Use of this information constitutes acceptance for use in an AS IS condition. There are NO warranties, implied or otherwise, with regard to this information or its use. Any use of this information is at the user's risk. It is the responsibility of user to evaluate the accuracy, completeness or usefulness of any information, opinion, advice or other content. EACH USER WILL BE SOLELY RESPONSIBLE FOR ANY consequences of his or her direct or indirect use of this web site. ALL WARRANTIES OF ANY KIND ARE EXPRESSLY DISCLAIMED. This site will NOT BE LIABLE FOR ANY DIRECT, INDIRECT or any other kind of loss.