2069526.1

Service Bulletin Details

Public Details for: 2069526.1

Bentley airline seat footrest - guidelines regarding the completion of sc23/04 customer statement: -a software update is now available for address 0006 (front passenger seat control unit) the update relates to the operation of the bentley


- 2023 -

Technical product information
Topic
Market
area
Bentley airline seat footrest - Guidelines regarding the completion of SC23/04
Australia E04 Bentley rest Asia and Australia (6E04),China 796 VW Import Comp. Ltd (Vico), Beijing (6796),Germany E02 Bentley
rest Europe (6E02),United Arab Emirates E06 Bentley Middle East and Africa (6E06),United Kingdom E01 Bentley UK
(6E01),United States E05 Bentley USA and rest America (6E05)
Bentley
Brand
Transaction
2069526/1
No.
Level
EH
Status
Approval
Release
date
New customer code
Object of complaint
body fixtures and fittings -> operation and control, seats, seatbench, armrests, 1st row -> electrical
seat adjustment, 1st row
Vehicle data
Bentayga EWB
Sales types
Type MY Brand Designation Engine code Gearbox code Final drive code
ZV1* 2023 E
*
*
*
Documents
Document name
master.xml
INTERNAL
Complaint type
functionality -> without function
/ defect
Position
Technical product information
Bentley airline seat footrest - Guidelines regarding the completion of SC23/04
Transaction No.: 2069526/1
Customer statement / workshop findings
A software update is now available for address 0006 (Front passenger seat control unit) The update relates to the operation of the Bentley
airline seat footrest. The footrest is integrated into the back of the front passenger seat
NOTICE
The software update eliminates the risk of the footrest failing to deploy or stow
Technical background
The operative must check and confirm that (SC23/04) is VIN applicable
In the event that (SC23/04) is VIN applicable the operative must conduct the Service Campaign to completion
However in the event that (SC23/04) is not VIN applicable and there is an operational issue with the Bentley airline seat
footrest, the operative should raise a Technical DISS query and await feedback before conducting any further work
Production change
-
Measure
-
INTERNAL


© dot.report 2024

Use of this information constitutes acceptance for use in an AS IS condition. There are NO warranties, implied or otherwise, with regard to this information or its use. Any use of this information is at the user's risk. It is the responsibility of user to evaluate the accuracy, completeness or usefulness of any information, opinion, advice or other content. EACH USER WILL BE SOLELY RESPONSIBLE FOR ANY consequences of his or her direct or indirect use of this web site. ALL WARRANTIES OF ANY KIND ARE EXPRESSLY DISCLAIMED. This site will NOT BE LIABLE FOR ANY DIRECT, INDIRECT or any other kind of loss.