Mcneilus Atlantic Front Loader 2016
Vehicle Details: Recalls, Service Bulletins
Below you will find all available information on the 2016 MCNEILUS Atlantic Front Loader.
Manufacturer | Known WMI(s) | Fuel Type |
---|---|---|
MCNEILUS |
Use the box here to look up VINs from MCNEILUS as well as other manufacturers
-
Are there recalls for the 2016 MCNEILUS Atlantic Front Loader?
- There are 2 recall(s) for the 2016 MCNEILUS Atlantic Front Loader, additional information is below.
Recall 143189 [USA]: If the prd does not activate in the event of a buildup of pressure, the cng tank may explode, increasing the risk of fire and injury.
Recall 132387 [USA]: The forcible ejection of the stem may increase the risk of injury to those nearby. additionally, the unintended release of cng can increase the risk of a fire.
To ensure accuracy and for your safety, it is recommended to do a free VIN recall check here or here [USA] - UK - Canada.
Bulletins are notices put out by manufacturers in conjunction with the NHTSA to notify the public of manufacturing issues or changes.
- MISC-TSIB-081 - FUEL SYSTEM, GASOLINE: According to an amended ruling in the visual inspection labeling requirement in federal motor vehicle safety standard (fmvss) no. 304, the periodic inspection interval for compressed natural gas (cng) fuel containers has been modified to
- MISC-TSIB-081 - FUEL SYSTEM, DIESEL:STORAGE:TANK ASSEMBLY: According to an amended ruling in the visual inspection labeling requirement in federal motor vehicle safety standard (fmvss) no. 304, the periodic inspection interval for compressed natural gas (cng) fuel containers has been modified to
- MISC-TSIB-079 - EQUIPMENT: Mcneilus truck and manufacturing provides these instructions for installing a hydraulic reservoir cork gasket. The installation of this gasket will repair leaks coming from the gasket between the in-tank filter and the reservoir.
- MISC-TSIB-075-A - EQUIPMENT:MECHANICAL: The following information describes how to purge air and release stored hydraulic energy from a hydraulic system. All manual override features are intended for emergency use, not for continuous-duty operation.
- FEL-WI-018-A - STRUCTURE: Mcneilus truck and manufacturing offers these instructions for repairing the lugs on the front loader meridian and front loader atlantic cng tailgates.
- MISC-TSIB-078 - EQUIPMENT: Mcneilus truck and manufacturing offers these instructions for ejector cylinder bypass testing.
- No comms 2021-01 - EQUIPMENT: There are no manufacturer communications in accordance with 49 cfr 579.5 to report for january 2021 for mcneilus truck & manufacturing, inc.
- VSR-WI-004-A - EQUIPMENT: Internal document work instructions. Mcneilus truck and manufacturing, inc. Has been alerted by our supplier that a concern affecting safety exists in some emcara pressure relief device (prd) valves on cng tanks (for your information,emcar
- VSR-WI-003-A - EQUIPMENT: Internal document work instructions. Mcneilus truck and manufacturing, inc. Has been alerted by our supplier that a concern affecting safety exists in some emcara pressure relief device (prd) valves on cng tanks (for your information,emcar
- FEL-TSIB-048 - A - STRUCTURE: This technical service information bulletin describes the replacement of a refuse deflector with a cover system that provides enhanced refuse deflection. The refuse deflector system is designed to sweep refuse off of the hopper cover and in
- FEL-TSIB-049 - A - EQUIPMENT ADAPTIVE/MOBILITY: This technical service information bulletin describes the replacement of a refuse deflector with a cover system that provides enhanced refuse deflection. The refuse deflector system is designed to sweep refuse off of the hopper cover and in
- MISC-TSIB-072 - - STRUCTURE: This technical service information bulletin describes the replacement of a snapper pin with a bolted joint in the body service lift pin assembly. The body service lift is used to raise the refuse collection body during maintenance operation