Mcneilus Zero-radius 2020

Vehicle Details: Service Bulletins

Below you will find all available information on the 2020 MCNEILUS ZERO-RADIUS.

ManufacturerKnown WMI(s)Fuel Type
MCNEILUS
MCNEILUS VIN Decoder

Use the box here to look up VINs from MCNEILUS as well as other manufacturers

#
NHTSA Mandated Recalls

No recalls could be found for this vehicle. To ensure accuracy and for your safety, do a free VIN recall check here or here [USA] - UK - Canada.

Bulletins

Bulletins are notices put out by manufacturers in conjunction with the NHTSA to notify the public of manufacturing issues or changes.

  • MISC-TSIB-081 - FUEL SYSTEM, DIESEL:STORAGE:TANK ASSEMBLY: According to an amended ruling in the visual inspection labeling requirement in federal motor vehicle safety standard (fmvss) no. 304, the periodic inspection interval for compressed natural gas (cng) fuel containers has been modified to
  • ZR-TSIB-015 - ENGINE AND ENGINE COOLING: Mcneilus truck and manufacturing offers these instructions for the installation of a hydraulic reservoir breather upgrade kit to reduce oil leakage in in-body hydraulic reservoirs and frame mounted hydraulic reservoirs on zero radius (zr)
  • MISC-TSIB-081 - FUEL SYSTEM, DIESEL:STORAGE:TANK ASSEMBLY: According to an amended ruling in the visual inspection labeling requirement in federal motor vehicle safety standard (fmvss) no. 304, the periodic inspection interval for compressed natural gas (cng) fuel containers has been modified to
  • WM-TSIB-022 - FUEL SYSTEM, DIESEL:STORAGE:TANK ASSEMBLY: Mcneilus truck and manufacturing offers these instructions for the installation (retrofit installation) of a streetside panel/door on the tailgate in an effort to reduce trash buildup behind the cng cover. This is for zero radius trucks w
  • MISC-TSIB-079 - EQUIPMENT: Mcneilus truck and manufacturing provides these instructions for installing a hydraulic reservoir cork gasket. The installation of this gasket will repair leaks coming from the gasket between the in-tank filter and the reservoir.
  • ZR-TSIB-013 - UNKNOWN OR OTHER: The procedures in this bulletin detail the process of replacing connex bushings with spherical bearings in the cylinder pin holes on zr finger weldments.
  • MISC-TSIB-075-A - EQUIPMENT:MECHANICAL: The following information describes how to purge air and release stored hydraulic energy from a hydraulic system. All manual override features are intended for emergency use, not for continuous-duty operation.
  • MISC-TSIB-078 - EQUIPMENT: Mcneilus truck and manufacturing offers these instructions for ejector cylinder bypass testing.
  • MISC-TSIB-077 - FUEL SYSTEM, GASOLINE: Mcneilus truck and manufacturing offers these instructions for the installation of a new streetside cover panel with thumb latch on the doors and a new curbside cover panel with doors (having doors on panel is a new feature for the curbsid
  • No comms 2021-01 - EQUIPMENT: There are no manufacturer communications in accordance with 49 cfr 579.5 to report for january 2021 for mcneilus truck & manufacturing, inc.
  • ZR-TSB-006 - EQUIPMENT: The procedures in this bulletin detail rework on the zero radius grabber finger cylinder pillow blocks, finger weldments, and grabber finger mounting blocks.

© dot.report 2024

Use of this information constitutes acceptance for use in an AS IS condition. There are NO warranties, implied or otherwise, with regard to this information or its use. Any use of this information is at the user's risk. It is the responsibility of user to evaluate the accuracy, completeness or usefulness of any information, opinion, advice or other content. EACH USER WILL BE SOLELY RESPONSIBLE FOR ANY consequences of his or her direct or indirect use of this web site. ALL WARRANTIES OF ANY KIND ARE EXPRESSLY DISCLAIMED. This site will NOT BE LIABLE FOR ANY DIRECT, INDIRECT or any other kind of loss.