SB-10054516-6226
Classificatio n:
AT13-009a
Reference:
Date:
NTB14-002a
March 4, 2014
2008-2012 ROGUE; REDUCED PERFORMANCE DUE TO
CVT FLUID TEMPERATURE PROTECTION LOGIC
This bulletin has been amended. A parts order form has been added. To address this change,
text has been added to ACTION and PARTS INFORMATION. Please discard all previous versions.
APPLIED VEHICLE: 2008-2012 Rogue (S35) 2WD/4WD without tow package kit
IF YOU CONFIRM:
The maximum vehicle speed is, or was, reduced by the CVT fail-safe logic after continuous
operation under the following conditions:
•
High RPM and/or high speed driving
(RPM of 4000+ or speeds of 65 mph [104.6 km/h] for 1.0 – 1.5 hrs. or more)
•
Driving in ambient temperature of 96 degrees or higher
•
Climbing steep or extended hills for 6 miles (9.6 km) or more
•
Whine or rattle type noise occurring during reduced engine performance (vehicle
speed decrease)
NOTE: Before applying this bulletin, check and repair any DTCs first.
ACTION:
Install SERVICE KIT-COOLER ASSY (see PARTS INFORMATION).
NOTE: This kit is on part restriction. Use the order form at the end of this
bulletin.
IMPORTANT: The purpose of ACTION (above) is to give you a quick idea of the work you will be performing.
You MUST closely follow the entire SERVICE PROCEDURE as it contains information that is essential to
successfully completing the repair.
Nissan Bulletins are intended for use by qualified technicians, not 'do-it-yourselfers'. Qualified technicians are
properly trained individuals who have the equipment, tools, safety instruction, and know-how to do a job
properly and safely. NOTE: If you believe that a described condition may apply to a particular vehicle, DO
NOT assume that it does. See your Nissan dealer to determine if this applies to your vehicle.
1/14
SERVICE PROCEDURE
Install Oil Cooler (CVT mounted heat exchanger with 4 ports)
1. Place the vehicle on a lift and raise
it as needed to perform the following
procedure.
Air inlet duct
2. Remove the front Bumper Fascia
Assembly, front Under Cover, left front
Fender Protector and left Air Guide.
•
Refer to the appropriate section of
the ESM for the procedures to
remove the items in step 2.
NOTE: The Air Guide is connected
to the Radiator core support with a
J-hook and must be lifted up before
being pulled forward to remove.
Left side air guide
Figure 1
Clamp coolant hoses
3. Remove the Air Inlet Duct from the Air
Cleaner Case.
WARNING: Never remove the radiator cap
when the engine is hot. Serious burns may
occur from high-pressure engine coolant
escaping from the radiator.
4. Relieve any residual cooling system
pressure.
a. Wrap a thick cloth around the
radiator cap. Slowly turn it a quarter
of a turn to release the pressure.
Figure 2
b. Then turn it all the way.
5. Clamp both of the coolant hoses
attached to the CVT Fluid Cooler
to prevent coolant loss.
2/14
NTB14-002a
6. Remove “bolt A” and loosen “bolt B”
for the Water Hose Bracket in
Figure 3.
Bolt B
Bolt A
Figure 3
CVT fluid cooler
7. Remove the spring clamps from the
CVT Fluid Cooler water hoses and
then remove both hoses from the
CVT Fluid Cooler.
NOTE: These spring clamps will be
saved and reused for reassembly.
Figure 4
Do not disturb filter
8. Remove the CVT Fluid Cooler
mounting bolts and remove the
CVT Fluid Cooler.
9. Clean any debris from the CVT Fluid
Cooler mounting surface with brake
cleaner and a lint free cloth.
Clean surface
NOTE: Use genuine Nissan Brake
Cleaner or equivalent. Make sure the
product that is used complies with
local regulations.
3/14
Figure 5
NTB14-002a
10. Coat the new O-ring on CVT Fluid
Cooler using NS-2 CVT fluid before
installing it onto the CVT Cooler
mounting area.
Coat O-ring
with NS-2
11. Install the new CVT Fluid Cooler from
the kit onto the CVT and tighten the
mounting bolts to
3.63 N•m (0.37 kg-m, 32 in-lb).
Figure 6
Spring clamps
mounted on
water hoses
12. Remove any residual coolant from the
inside of both of the coolant hoses
before re-assembly of the hoses to the
CVT fluid cooler.
NOTE: Use genuine Nissan Brake
Cleaner or equivalent. Make sure the
product that is used complies with local
regulations.
Figure 7
13. Re-install the water hoses onto the new CVT Fluid Cooler and then reinstall the spring
clamps.
•
Position the spring clamps as close to each fitting bulge as possible and then
release them.
NOTE: Confirm that the clamps are not on top of each fitting bulge or on an angle.
14. Re-install the Water Hose Bracket and tighten bolt A and bolt B from step 6 to
4.2 N•m (0.43 kg-m, 37 in-lb).
4/14
NTB14-002a
Install the COOLER ASSY-AUTO TRANS (external air-to-ATF CVT cooler)
1. Remove the SEAL-LOWER and create a notch to clear new BRKT ASSY-O/COOLER,
LWR, and then re-install the SEAL-LOWER.
a. See Figure 10 for reference to locate the pre-existing weld nuts in the lower radiator
support that the BRKT ASSY-O/COOLER, LWR (No. 3), shown in Figure 11 and
Figure 12, will be attached to.
b. Place the BRKT ASSY-O/COOLER, LWR from the kit over the SEAL-LOWER and
mark “bracket width” where the material will be removed as shown in Figure 8 and
Figure 10.
c. Remove only enough material (Figure 9 and Figure 10) to allow the BRKT ASSYO/COOLER, LWR to be installed to the lower radiator support (approximately
127mm x 50.8mm [5” x 2”]).
o Remove gently to avoid cracking the material.
SEAL-LOWER
Figure 8
without notch
Before making
the notch
with
notch
After
making
the notch
Pre-existing weld nuts
Step 1: Remove material from here
Figure 9
Figure 10
Figure 9 and Figure 10 illustrate the area to remove the material to allow clearance to
install the BRKT ASSY-O/COOLER, LWR.
5/14
NTB14-002a
No. 16
No. 13
5.9 N•m
(0.60 kg-m, 52 in-lb)
No. 2
No. 3
No. 12
7 N•m
(0.71 kg-m, 62 in-lb)
No. 1
No. 12
7 N•m
(0.71 kg-m, 62 in-lb)
No. 13
5.9 N•m
(0.60 kg-m, 52 in-lb)
Figure 11
Figure 11 illustrates the COOLER ASSY-AUTO TRANS and attachment points to vehicle
and is for reference when performing steps on page 7.
NOTE: Refer to Table A on page 13 for parts descriptions and quantities in the kit.
6/14
NTB14-002a
BRKT ASSY-O/COOLER, LWR
NOTE: Refer to Figure 11 on page 6 for
steps 2-4 below.
2. Install BRKT ASSY-O/COOLER, LWR
(No. 3) to the lower radiator support.
Figure12
3. Install BRKT ASSY-O/COOLER, UPR
(No. 2) to the center member.
•
Leave nuts loose at this time.
BRKT ASSY-O/COOLER, UPR
Figure 13
4. Install COOLER ASSY-AUTO TRANS,
OIL (No. 1) and torque all bolts to
specifications provided in Figure 11.
COOLER ASSYAUTO TRANS,
OIL
Figure 14
7/14
NTB14-002a
Assemble the Hoses and Side Bracket
No.NO.15
11
No.
NO.8 8
No.NO.6
6
No.NO.5
5
No.
NO.1111
No.
11
NO.11
No.
NO.9
9
No.
NO.1010
No.NO.11
11
No.NO.11
11
NO.4 4
No.
NO.77
No.
Figure 15
Figure 15 illustrates the COOLER ASSY-AUTO TRANS Hose Assembly referenced in
steps 1-3 on page 9.
NOTE: Refer to Table A on page 13 for parts descriptions and quantities in the kit.
8/14
NTB14-002a
NOTE: Refer to Figure 15 on page 8 for steps 1-3 below.
1. Install hoses (No. 6/7/8/9) to TUBE-OIL
COOLER (No. 5) with CLAMP-HOSE
(spring clamp No. 11).
•
Match the color marks on the hoses
and rotate until the marks are
aligned (Figure 16).
•
Position the spring clamps as close
to each fitting bulge as possible and
then release them.
NOTE: Confirm that the clamps are not
on top of a fitting bulge or on an angle.
No. 8
No. 6
No.11
No. 5
No.11
No. 7
No. 9
Figure 16
CLIP-TUBE
2. Install the CLIP-TUBE (No. 10) to the
BRKT ASSY-O/COOLER, SIDE (No.4).
BRKT ASSYO/COOLER, SIDE
Figure 17
Pink on top
3. Assemble the Hoses to the Bracket.
•
Install the pink color coded hose on
the top and the green on the bottom
of BRKT ASSY-O/COOLER, SIDE
(No.4).
Green on
bottom
9/14
Figure 18
NTB14-002a
Install Hose and Bracket assemblies
NOTE: Refer to Figure 15 on page 8 and Figure 19 below for steps 1-3 below.
1. Install the assembled HOSE and BRKT onto the vehicle:
a. Pass the hoses shown in blue (Figure 19) between the radiator and the bulkhead.
b. Install BRKT ASSY-O/COOLER, SIDE (No. 4) with two bolts (No. 14) to the
pre-existing weld nuts and torque with the specification provided in Figure 19.
Hose should pass through
between the radiator and
the left side member
Pre-existing weld
nut location
No. 14
17.15 N•m
(1.7 kg-m, 13 ft-lb)
Figure 19
Figure 19
10/14
NTB14-002a
2. Place 2 new CLAMP-HOSE (spring clamp, No. 11) onto the hoses and install the HOSE
(No. 6/7, Figure 15) onto COOLER ASSY-AUTO TRANS, OIL (No. 1) with the white
paint marks facing toward front of the vehicle (Figure 20).
•
Position the spring clamps as close to each fitting bulge as possible and then
release them.
NOTE: Confirm that the clamps are not on top of a fitting bulge or on an angle.
TheWwhite
paint mark
markshoud
shouldbe
be
hite Paint
toward the front of the vehicle
torward vehicle front side
Figure 20
11/14
NTB14-002a
3. Place 2 new CLAMP-HOSE (spring clamp, No. 11) onto the hoses and install the cooler
hoses (shown in blue, Figure 21) to the CVT Fluid Cooler.
•
Position the spring clamps as close to each fitting bulge as possible and then
release them.
NOTE: Confirm that the clamps are not on top of a fitting bulge or on an angle.
Insert
this
Insert
thisdirection
direction
Paint mark
shouldshould
Paint
marks
be matched
be aligned
Insert direction
this direction
Insert this
No.
11
NO.15
Figure 21
4. Re-install the front Bumper Fascia Assembly, front Under Cover, left front Fender
Protector, left Air Guide, and the Air Inlet Duct in the reverse order.
5. Check the level of the coolant and add as needed.
•
Refer to ESM for correct coolant for the model year vehicle that is being worked on.
6. Check the level of the CVT NS-2 Fluid and add as needed.
•
Refer to ESM for correct method to check fluid level for the model year vehicle that
is being worked on.
12/14
NTB14-002a
PARTS INFORMATION
DESCRIPTION
SERVICE KIT-COOLER ASSY
PART #
NS-2 CVT Fluid
*
**
B1606-JM01A *
QUANTITY
1
999MP-NS200P **
As needed
This kit is on part restriction. Order this kit using the order form on the next page.
Order this item through the Nissan Maintenance Advantage program:
Phone: 877-NIS-NMA1 (877-647-6621). Website order via link on dealer portal
www.NNAnet.com and click on the “Maintenance Advantage” link
Table A
INDEX
1
PART NAME
COOLER ASSY-AUTO TRANS OIL (air-to-ATF cooler)
QTY PER
KIT
1
2
3
4
BRKT ASSY-O/COOLER, UPR
BRKT ASSY-O/COOLER, LWR
BRKT ASSY-O/COOLER, SIDE
1
1
1
5
TUBE-OIL COOLER
2
6
7
8
HOSE-AUTO TRANS, UPR
HOSE-AUTO TRANS, LWR
HOSE-AUTO TRANS, UPR (2)
1
1
1
9
HOSE-AUTO TRANS, LWR (2)
1
10
11
12
CLIP-TUBE (INSULATOR)
CLAMP-HOSE
BOLT-HEX,PP W/CON SPW
1
8
3
13
BOLT-HEX,PP W/CON SPW
4
14
14a
16
BOLT-HEX,PP W/CON SPW
NUT-HEX,PP W/CON SPW
NUT-HEX,PP W/CON SPW
2
2
2
18
OIL COOLER (CVT mounted heat exchanger with 4 ports)
1
19
OIL COOLER O-RING
1
20
Clip for lower seal
2
CLAIMS INFORMATION
Submit a Primary Part (PP) type line claim using the following claims coding:
DESCRIPTION
PFP
OP CODE SYM
DIA
FRT
Oil cooler kit installation
(1)
JX15AA
AE
32
1.5
(1) Refer to the electronic parts catalog (FAST) and use the Oil Cooler assembly part
number (21606 -*****) as the Primary Failed Part (PFP).
13/14
NTB14-002a
PARTS ORDER FORM
For
Rogue Oil Cooler Repair Kit
INCOMPLETE ORDER FORMS WILL NOT BE PROCESSED
Dealer Code: _______ Order Date: _________
Dealership Email Address: ___________________________
VIN: _ _ _ _ _ _ _ _ _ _ _
PDC:
______
Sacramento PDC
Los Angeles PDC
Dallas PDC
Baltimore PDC
New York PDC
Orlando PDC
Chicago PDC
Greenville PDC
Memphis – Olive Branch PDC
External Oil cooler kit
Quantity
B1606-JM01A
Per VIN only
Email the completed form to:
[email protected]
NOTE: This bulletin and Service Procedure is not a campaign. For convenience,
the above email address is being used to fulfill and expedite this part request.
14/14
NTB14-002a

SB-10054516-7501
Classification:
AT13-009b
Reference:
Date:
NTB14-002b
August 15, 2014
2008-2012 ROGUE; REDUCED PERFORMANCE DUE TO CVT
FLUID TEMPERATURE PROTECTION LOGIC
This bulletin has been amended to remove the pre-authorization check sheet and to
add the procedure to check CVT temp count A/B. Please discard all previous versions.
APPLIED VEHICLE:
2008-2012 Rogue (S35) 2WD/4WD without tow package kit
IF YOU CONFIRM:
The vehicle speed is, or was, reduced by the CVT fail-safe (reduced vehicle speed) after
continuous operation under the following conditions:

High RPM and/or high speed driving
(RPM of 4000+ or speeds of 65 mph [104.6 km/h] for 1.0 – 1.5 hrs. or more)

Driving in ambient temperature of 96 degrees or higher

Climbing steep or extended hills for 6 miles (9.6 km) or more

Whine or rattle type noise occurring during reduced engine performance (vehicle
speed decrease)
NOTE: Before applying this bulletin check and repair any DTCs first.
ACTION
1. Perform a self-diagnosis with CONSULT-III plus (C-III plus).
 If DTCs are present, refer to the appropriate section of the Electronic Service
Manual (ESM) and diagnose the DTCs first before proceeding to step 2 of
ACTION.
2. Check the number of counts of "CVT-A” and “CVT-B" with C-III plus.
 Refer to the Flow Chart on page 2 and the Service Procedure starting on page 3
to confirm if this bulletin applies.
IMPORTANT: The purpose of “ACTION” (above) is to give you a quick idea of the work you will be
performing. You MUST closely follow the entire Service Procedure as it contains information that is essential
to successfully completing the repair.
Nissan Bulletins are intended for use by qualified technicians, not 'do-it-yourselfers'. Qualified technicians are
properly trained individuals who have the equipment, tools, safety instruction, and know-how to do a job
properly and safely. NOTE: If you believe that a described condition may apply to a particular vehicle, DO
NOT assume that it does. See your Nissan dealer to determine if this applies to your vehicle.
1/16
Flow Chart
Important
Before applying this bulletin:

Confirm that the CVT fluid has not been overfilled and/or that a non-approved
CVT fluid has been added.

Confirm that the coolant concentration is not greater than 50%.
 CVT fluid that is overfilled or non-approved, or coolant concentrations
greater than 50% can cause the symptoms in the IF YOU CONFIRM
section on page 1.
Refer to NTB12-057 to resolve these conditions first if they should
occur.
NOTE: Refer to the ESM for the correct CVT fluid and coolant type for the model and
year vehicle that is being worked on.
Check the CVT-A
and CVT-B counts
with C-III plus.
Yes
Is the CVT-A
count greater
than 1?
No
Refer to bulletin
NTB12-057 for related
service information.
Install the External CVT
Fluid Cooler kit.
 Go to page 5.
NOTE: If the CVT-A count is not greater than 1 and similar symptoms to those in
IF YOU CONFIRM and/or a DTC are present, refer to the Electronic Service Manual
(ESM) and NTB12-057 for further diagnosis.
2/16
NTB14-002b
SERVICE PROCEDURE
Check CVT-A and CVT-B count with C-III plus
1. Open C-III plus and select
Diagnosis (All Systems).
Select
Figure 1
2. Select TRANSMISSION.
Step 2
Figure 2
3/16
NTB14-002b
3. In Data Monitor select TRANSMISSION
and then select CVT-A and CVT-B.
Select
TRANSMISSION
Select CVT-A
and CVT-B
4. Select START.
Step 4
Figure 3
Confirm VIN is
present
5. Check both CVT-A and CVT-B counts
and refer to the Flow Chart on page 2 to
confirm if this bulletin applies.

Save this page to a file on the Consult
PC for Step 6.
NOTE: If the CVT-A count is not greater
than 1 and similar symptoms to those in
IF YOU CONFIRM and/or a DTC are
present, refer to the ESM and
NTB12-057 for further diagnosis.
CVT-A and
CVT-B counts
Figure 4
6. If it is confirmed that this bulletin applies, submit an order for the SERVICE KIT
listed in the Parts Information table by sending an email with the screen print
(Figure 4) from Step 5 to:
[email protected]
IMPORTANT: Please make sure the VIN number is clearly visible at the top of the
screen print from Step 5 (Figure 4).

Once DPIC has validated the order, a salesforce case will be generated for
reference. You will receive a confirmation and the sales force case number to
track the order status.

Once the order is completed, you will receive a final confirmation of the order,
including ETA of part arrival.
4/16
NTB14-002b
SERVICE PROCEDURE
Install Oil Cooler (CVT mounted heat exchanger with 4 ports)
1. Place the vehicle on a lift and raise it as
needed to perform the following
procedure.
Air Inlet Duct
2. Remove the front Bumper Fascia
Assembly, front Under Cover, left front
Fender Protector and left Air Guide.

Refer to the appropriate section of
the ESM for the procedures to
remove the items in step 2.
NOTE: The Air Guide is connected
to the Radiator core support with a
J-hook and must be lifted up before
being pulled forward to remove.
Left side Air Guide
Figure 5
Clamp coolant hoses
3. Remove the Air Inlet Duct from the Air
Cleaner Case.
WARNING: Never remove the radiator cap
when the engine is hot. Serious burns may
occur from high-pressure engine coolant
escaping from the radiator.
4. Relieve any residual cooling system
pressure.
a. Wrap a thick cloth around the
radiator cap. Slowly turn it a quarter
of a turn to release the pressure.
Figure 6
b. Then turn it all the way.
5. Clamp both of the coolant hoses
attached to the CVT Fluid Cooler to
prevent coolant loss.
5/16
NTB14-002b
6. Remove “bolt A” and loosen “bolt B”
for the Water Hose Bracket in
Figure 7.
Bolt B
Bolt A
Figure 7
CVT Fluid Cooler
7. Remove the spring clamps from the
CVT Fluid Cooler water hoses and
then remove both hoses from the CVT
Fluid Cooler.
NOTE: These spring clamps will be
saved and reused for reassembly.
Figure 8
8. Remove the CVT Fluid Cooler
mounting bolts and remove the CVT
Fluid Cooler.
Do not disturb filter
9. Clean any debris from the CVT Fluid
Cooler mounting surface with brake
cleaner and a lint free cloth.
NOTE: Use genuine Nissan Brake
Cleaner or equivalent. Make sure the
product that is used complies with
local regulations.
Clean surface
Figure 9
6/16
NTB14-002b
10. Coat the new O-ring on CVT Fluid
Cooler using NS-2 CVT fluid before
installing it onto the CVT Cooler
mounting area.
Coat O-ring
with NS-2
11. Install the new CVT Fluid Cooler from
the kit onto the CVT and tighten the
mounting bolts to
3.63 N•m (0.37 kg-m, 32 in-lb).
Figure 10
Water hoses with spring clamps
12. Remove any residual coolant from the
inside of both of the coolant hoses
before re-assembly of the hoses to the
CVT fluid cooler.
NOTE: Use genuine Nissan Brake
Cleaner or equivalent. Make sure the
product that is used complies with local
regulations.
Figure 11
13. Re-install the water hoses onto the new CVT Fluid Cooler and then reinstall the spring
clamps.

Position the spring clamps as close to each fitting bulge as possible and then
release them.
NOTE: Confirm that the clamps are not on top of each fitting bulge or on an angle.
14. Re-install the Water Hose Bracket and tighten bolt A and bolt B from step 6 to
4.2 N•m (0.43 kg-m, 37 in-lb).
7/16
NTB14-002b
Install the COOLER ASSY-AUTO TRANS (external air-to-ATF CVT cooler)
1. Remove the SEAL-LOWER and create a notch to clear new BRKT ASSY-O/COOLER,
LWR, and then re-install the SEAL-LOWER.
a. See Figure 14 for reference to locate the pre-existing weld nuts in the lower radiator
support that the BRKT ASSY-O/COOLER, LWR (No. 3), shown in Figure 15 and
Figure 16, will be attached to.
b. Place the BRKT ASSY-O/COOLER, LWR from the kit over the SEAL-LOWER and
mark “bracket width” where the material will be removed as shown in Figure 12 and
Figure 14.
c. Remove only enough material (Figure 13 and Figure 14) to allow the BRKT ASSYO/COOLER, LWR to be installed to the lower radiator support (approximately
127mm x 50.8mm [5” x 2”]).
o Remove gently to avoid cracking the material.
SEAL-LOWER
Figure 12
without notch
Before making
the notch
with notch
After
making
the notch
Step 1: Remove material from here
Pre-existing weld nuts
Figure 13
Figure 14
Figure 13 and Figure 14 illustrate the area to remove the material to allow clearance to
install the BRKT ASSY-O/COOLER, LWR.
8/16
NTB14-002b
No. 16
No. 13
5.9 N•m
(0.60 kg-m, 52 in-lb)
No. 2
No. 3
No. 12
7 N•m
(0.71 kg-m, 62 in-lb)
No. 1
No. 12
7 N•m
(0.71 kg-m, 62 in-lb)
No. 13
5.9 N•m
(0.60 kg-m, 52 in-lb)
Figure 15
Figure 15 illustrates the COOLER ASSY-AUTO TRANS and attachment points to vehicle
and is for reference when performing steps on page 10.
NOTE: Refer to Table A on page 16 for parts descriptions and quantities in the kit.
9/16
NTB14-002b
BRKT ASSY-O/COOLER, LWR
NOTE: Refer to Figure 15 on page 9 for
steps 2-4 below.
2. Install BRKT ASSY-O/COOLER, LWR
(No. 3) to the lower radiator support.
Figure16
3. Install BRKT ASSY-O/COOLER, UPR
(No. 2) to the center member.

Leave nuts loose at this time.
BRKT ASSY-O/COOLER, UPR
Figure 17
4. Install COOLER ASSY-AUTO TRANS,
OIL (No. 1) and torque all bolts to
specifications provided in Figure 15.
COOLER ASSYAUTO TRANS,
OIL
Figure 18
10/16
NTB14-002b
Assemble the Hoses and Side Bracket
No.NO.15
11
No.
NO.8 8
No.NO.6
6
No.NO.5
5
No.
NO.1111
No.
NO.11 11
No.
NO.9
9
NO.1010
No.
No.NO.11
11
No.NO.11
11
NO.4 4
No.
NO.77
No.
Figure 19
Figure 19 illustrates the COOLER ASSY-AUTO TRANS Hose Assembly referenced in
steps 1-3 on page 12.
NOTE: Refer to Table A on page 16 for parts descriptions and quantities in the kit.
11/16
NTB14-002b
NOTE: Refer to Figure 19 on page 11 for steps 1-3 below.
1. Install hoses (No. 6/7/8/9) to TUBE-OIL
COOLER (No. 5) with CLAMP-HOSE
(spring clamp No. 11).

Match the color marks on the hoses
and rotate until the marks are
aligned (Figure 20).

Position the spring clamps as close
to each fitting bulge as possible and
then release them.
NOTE: Confirm that the clamps are not
on top of a fitting bulge or on an angle.
No. 8
No. 6
No.11
No. 5
No.11
No. 7
No. 9
Figure 20
CLIP-TUBE
2. Install the CLIP-TUBE (No. 10) to the
BRKT ASSY-O/COOLER, SIDE (No.4).
BRKT ASSYO/COOLER, SIDE
Figure 21
Pink on top
3. Assemble the Hoses to the Bracket.

Install the pink color coded hose on
the top and the green on the bottom
of BRKT ASSY-O/COOLER, SIDE
(No.4).
Green on
bottom
12/16
Figure 22
NTB14-002b
Install Hose and Bracket assemblies
NOTE: Refer to Figure 19 on page 11 and Figure 23 below for steps 1-3 below.
1. Install the assembled HOSE and BRKT onto the vehicle:
a. Pass the hoses shown in blue (Figure 23) between the radiator and the bulkhead.
b. Install BRKT ASSY-O/COOLER, SIDE (No. 4) with two bolts (No. 14) to the
pre-existing weld nuts and torque with the specification provided in Figure 23.
Hose should pass through
between the radiator and
the left side member
Pre-existing weld
nut location
No. 14
17.15 N•m
(1.7 kg-m, 13 ft-lb)
Figure 19
Figure 23
13/16
NTB14-002b
2. Place 2 new CLAMP-HOSE (spring clamp, No. 11) onto the hoses and install the HOSE
(No. 6/7, Figure 19) onto COOLER ASSY-AUTO TRANS, OIL (No. 1) with the white
paint marks facing toward front of the vehicle (Figure 24).

Position the spring clamps as close to each fitting bulge as possible and then
release them.
NOTE: Confirm that the clamps are not on top of a fitting bulge or on an angle.
TheWhite
whitePaint
paint mark
markshoud
shouldbe
be
toward
the
front
of
the
vehicle
torward vehicle front side
Figure 24
14/16
NTB14-002b
3. Place 2 new CLAMP-HOSE (spring clamp, No. 11) onto the hoses and install the cooler
hoses (shown in blue, Figure 25) to the CVT Fluid Cooler.

Position the spring clamps as close to each fitting bulge as possible and then
release them.
NOTE: Confirm that the clamps are not on top of a fitting bulge or on an angle.
Insert
this
Insert
thisdirection
direction
Paint mark should
Paint
marks should
be matched
be aligned
Insert direction
this direction
Insert this
NO.1
No.
115
Figure 25
4. Re-install the front Bumper Fascia Assembly, front Under Cover, left front Fender
Protector, left Air Guide, and the Air Inlet Duct in the reverse order.
5. Check the level of the coolant and add as needed.

Refer to ESM for correct coolant for the model year vehicle that is being worked on.
6. Check the level of the CVT NS-2 Fluid and add as needed.

Refer to ESM for correct method to check fluid level for the model year vehicle that
is being worked on.
15/16
NTB14-002b
PARTS INFORMATION
*
DESCRIPTION
SERVICE KIT-COOLER ASSY
PART #
B1606-JM01A
QUANTITY
1
NS-2 CVT Fluid
999MP-NS200P*
As needed
Order this item through the Nissan Maintenance Advantage program:
Phone: 877-NIS-NMA1 (877-647-6621). Website order via link on dealer portal
www.NNAnet.com and click on the “Maintenance Advantage” link
Table A
INDEX
1
PART NAME
COOLER ASSY-AUTO TRANS OIL (air-to-ATF cooler)
QTY PER
KIT
1
2
3
4
BRKT ASSY-O/COOLER, UPR
BRKT ASSY-O/COOLER, LWR
BRKT ASSY-O/COOLER, SIDE
1
1
1
5
TUBE-OIL COOLER
2
6
7
8
HOSE-AUTO TRANS, UPR
HOSE-AUTO TRANS, LWR
HOSE-AUTO TRANS, UPR (2)
1
1
1
9
HOSE-AUTO TRANS, LWR (2)
1
10
11
12
CLIP-TUBE (INSULATOR)
CLAMP-HOSE
BOLT-HEX,PP W/CON SPW
1
8
3
13
BOLT-HEX,PP W/CON SPW
4
14
14a
16
BOLT-HEX,PP W/CON SPW
NUT-HEX,PP W/CON SPW
NUT-HEX,PP W/CON SPW
2
2
2
18
OIL COOLER (CVT mounted heat exchanger with 4 ports)
1
19
OIL COOLER O-RING
1
20
Clip for lower seal
2
CLAIMS INFORMATION
Submit a Primary Part (PP) type line claim using the following claims coding:
DESCRIPTION
PFP
OP CODE SYM
DIA
FRT
Oil cooler kit installation
(1)
JX15AA
AE
32
1.5
(1) Refer to the electronic parts catalog (FAST) and use the Oil Cooler assembly part
number (21606 -*****) as the Primary Failed Part (PFP).
16/16
NTB14-002b

SB-10054516-4107
Classification:
Reference:
AT13-009
Date:
NTB14-002
January 9, 2014
2008-2012 ROGUE; REDUCED PERFORMANCE DUE TO CVT
FLUID TEMPERATURE PROTECTION LOGIC
APPLIED VEHICLE:
2008-2012 Rogue (S35) 2WD/4WD without tow package kit
IF YOU CONFIRM:
The maximum vehicle speed is, or was, reduced by the CVT fail-safe logic after continuous
operation under the following conditions:
•
High RPM and/or high speed driving
(RPM of 4000+ or speeds of 65 mph [104.6 km/h] for 1.0 – 1.5 hrs. or more)
•
Driving in ambient temperature of 96 degrees or higher
•
Climbing steep or extended hills for 6 miles (9.6 km) or more
•
Whine or rattle type noise occurring during reduced engine performance (vehicle
speed decrease)
NOTE: Before applying this bulletin check and repair any DTCs first.
ACTION:
Install SERVICE KIT-COOLER ASSY.
IMPORTANT: The purpose of “ACTION” (above) is to give you a quick idea of the work you will be
performing. You MUST closely follow the entire Service Procedure as it contains information that is essential
to successfully completing the repair.
Nissan Bulletins are intended for use by qualified technicians, not 'do-it-yourselfers'. Qualified technicians are
properly trained individuals who have the equipment, tools, safety instruction, and know-how to do a job
properly and safely. NOTE: If you believe that a described condition may apply to a particular vehicle, DO
NOT assume that it does. See your Nissan dealer to determine if this applies to your vehicle.
1/13
SERVICE PROCEDURE
Install Oil Cooler (CVT mounted heat exchanger with 4 ports)
1. Place the vehicle on a lift and raise it as
needed to perform the following
procedure.
Air Inlet Duct
2. Remove the front Bumper Fascia
Assembly, front Under Cover, left front
Fender Protector and left Air Guide.
•
Refer to the appropriate section of
the ESM for the procedures to
remove the items in step 2.
NOTE: The Air Guide is connected
to the Radiator core support with a
J-hook and must be lifted up before
being pulled forward to remove.
Left side Air Guide
Figure 1
Clamp coolant hoses
3. Remove the Air Inlet Duct from the Air
Cleaner Case.
WARNING: Never remove the radiator cap
when the engine is hot. Serious burns may
occur from high-pressure engine coolant
escaping from the radiator.
4. Relieve any residual cooling system
pressure.
a. Wrap a thick cloth around the
radiator cap. Slowly turn it a quarter
of a turn to release the pressure.
Figure 2
b. Then turn it all the way.
5. Clamp both of the coolant hoses
attached to the CVT Fluid Cooler to
prevent coolant loss.
2/13
NTB14-002
6. Remove “bolt A” and loosen “bolt B”
for the Water Hose Bracket in
Figure 3.
Bolt B
Bolt A
Figure 3
CVT Fluid Cooler
7. Remove the spring clamps from the
CVT Fluid Cooler water hoses and
then remove both hoses from the CVT
Fluid Cooler.
NOTE: These spring clamps will be
saved and reused for reassembly.
Figure 4
Do not disturb filter
8. Remove the CVT Fluid Cooler
mounting bolts and remove the CVT
Fluid Cooler.
9. Clean any debris from the CVT Fluid
Cooler mounting surface with brake
cleaner and a lint free cloth.
Clean surface
NOTE: Use genuine Nissan Brake
Cleaner or equivalent. Make sure the
product that is used complies with
local regulations.
3/13
Figure 5
NTB14-002
10. Coat the new O-ring on CVT Fluid
Cooler using NS-2 CVT fluid before
installing it onto the CVT Cooler
mounting area.
Coat O-ring
with NS-2
11. Install the new CVT Fluid Cooler from
the kit onto the CVT and tighten the
mounting bolts to
3.63 N•m (0.37 kg-m, 32 in-lb).
Figure 6
Water hoses with spring clamps
12. Remove any residual coolant from the
inside of both of the coolant hoses
before re-assembly of the hoses to the
CVT fluid cooler.
NOTE: Use genuine Nissan Brake
Cleaner or equivalent. Make sure the
product that is used complies with local
regulations.
Figure 7
13. Re-install the water hoses onto the new CVT Fluid Cooler and then reinstall the spring
clamps.
•
Position the spring clamps as close to each fitting bulge as possible and then
release them.
NOTE: Confirm that the clamps are not on top of each fitting bulge or on an angle.
14. Re-install the Water Hose Bracket and tighten bolt A and bolt B from step 6 to
4.2 N•m (0.43 kg-m, 37 in-lb).
4/13
NTB14-002
Install the COOLER ASSY-AUTO TRANS (external air-to-ATF CVT cooler)
1. Remove the SEAL-LOWER and create a notch to clear new BRKT ASSY-O/COOLER,
LWR, and then re-install the SEAL-LOWER.
a. See Figure 10 for reference to locate the pre-existing weld nuts in the lower radiator
support that the BRKT ASSY-O/COOLER, LWR (No. 3), shown in Figure 11 and
Figure 12, will be attached to.
b. Place the BRKT ASSY-O/COOLER, LWR from the kit over the SEAL-LOWER and
mark “bracket width” where the material will be removed as shown in Figure 8 and
Figure 10.
c. Remove only enough material (Figure 9 and Figure 10) to allow the BRKT ASSYO/COOLER, LWR to be installed to the lower radiator support (approximately
127mm x 50.8mm [5” x 2”]).
o Remove gently to avoid cracking the material.
SEAL-LOWER
Figure 8
without notch
Before making
the notch
with notch
After
making
the notch
Pre-existing weld nuts
Step 1: Remove material from here
Figure 9
Figure 10
Figure 9 and Figure 10 illustrate the area to remove the material to allow clearance to
install the BRKT ASSY-O/COOLER, LWR.
5/13
NTB14-002
No. 16
No. 13
5.9 N•m
(0.60 kg-m, 52 in-lb)
No. 2
No. 3
No. 12
7 N•m
(0.71 kg-m, 62 in-lb)
No. 1
No. 12
7 N•m
(0.71 kg-m, 62 in-lb)
No. 13
5.9 N•m
(0.60 kg-m, 52 in-lb)
Figure 11
Figure 11 illustrates the COOLER ASSY-AUTO TRANS and attachment points to vehicle
and is for reference when performing steps on page 7.
NOTE: Refer to Table A on page 13 for parts descriptions and quantities in the kit.
6/13
NTB14-002
BRKT ASSY-O/COOLER, LWR
NOTE: Refer to Figure 11 on page 6 for
steps 2-4 below.
2. Install BRKT ASSY-O/COOLER, LWR
(No. 3) to the lower radiator support.
Figure12
3. Install BRKT ASSY-O/COOLER, UPR
(No. 2) to the center member.
•
Leave nuts loose at this time.
BRKT ASSY-O/COOLER, UPR
Figure 13
4. Install COOLER ASSY-AUTO TRANS,
OIL (No. 1) and torque all bolts to
specifications provided in Figure 11.
COOLER ASSYAUTO TRANS,
OIL
Figure 14
7/13
NTB14-002
Assemble the Hoses and Side Bracket
No.NO.15
11
No.
NO.8 8
No.NO.6
6
No.NO.5
5
No.
NO.1111
No.
NO.11 11
No.
NO.9
9
NO.1010
No.
No.NO.11
11
No.NO.11
11
NO.4 4
No.
NO.77
No.
Figure 15
Figure 15 illustrates the COOLER ASSY-AUTO TRANS Hose Assembly referenced in
steps 1-3 on page 9.
NOTE: Refer to Table A on page 13 for parts descriptions and quantities in the kit.
8/13
NTB14-002
NOTE: Refer to Figure 15 on page 8 for steps 1-3 below.
1. Install hoses (No. 6/7/8/9) to TUBE-OIL
COOLER (No. 5) with CLAMP-HOSE
(spring clamp No. 11).
•
Match the color marks on the hoses
and rotate until the marks are
aligned (Figure 16).
•
Position the spring clamps as close
to each fitting bulge as possible and
then release them.
NOTE: Confirm that the clamps are not
on top of a fitting bulge or on an angle.
No. 8
No. 6
No.11
No. 5
No.11
No. 7
No. 9
Figure 16
CLIP-TUBE
2. Install the CLIP-TUBE (No. 10) to the
BRKT ASSY-O/COOLER, SIDE (No.4).
BRKT ASSYO/COOLER, SIDE
Figure 17
Pink on top
3. Assemble the Hoses to the Bracket.
•
Install the pink color coded hose on
the top and the green on the bottom
of BRKT ASSY-O/COOLER, SIDE
(No.4).
Green on
bottom
9/13
Figure 18
NTB14-002
Install Hose and Bracket assemblies
NOTE: Refer to Figure 15 on page 8 and Figure 19 below for steps 1-3 below.
1. Install the assembled HOSE and BRKT onto the vehicle:
a. Pass the hoses shown in blue (Figure 19) between the radiator and the bulkhead.
b. Install BRKT ASSY-O/COOLER, SIDE (No. 4) with two bolts (No. 14) to the
pre-existing weld nuts and torque with the specification provided in Figure 19.
Hose should pass through
between the radiator and
the left side member
Pre-existing weld
nut location
No. 14
17.15 N•m
(1.7 kg-m, 13 ft-lb)
Figure 19
Figure 19
10/13
NTB14-002
2. Place 2 new CLAMP-HOSE (spring clamp, No. 11) onto the hoses and install the HOSE
(No. 6/7, Figure 15) onto COOLER ASSY-AUTO TRANS, OIL (No. 1) with the white
paint marks facing toward front of the vehicle (Figure 20).
•
Position the spring clamps as close to each fitting bulge as possible and then
release them.
NOTE: Confirm that the clamps are not on top of a fitting bulge or on an angle.
TheWhite
whitePaint
paint mark
markshoud
shouldbe
be
toward
the
front
of
the
vehicle
torward vehicle front side
Figure 20
11/13
NTB14-002
3. Place 2 new CLAMP-HOSE (spring clamp, No. 11) onto the hoses and install the cooler
hoses (shown in blue, Figure 21) to the CVT Fluid Cooler.
•
Position the spring clamps as close to each fitting bulge as possible and then
release them.
NOTE: Confirm that the clamps are not on top of a fitting bulge or on an angle.
Insert
this
Insert
thisdirection
direction
Paint mark should
Paint
marks should
be matched
be aligned
Insert direction
this direction
Insert this
NO.1
No.
115
Figure 21
4. Re-install the front Bumper Fascia Assembly, front Under Cover, left front Fender
Protector, left Air Guide, and the Air Inlet Duct in the reverse order.
5. Check the level of the coolant and add as needed.
•
Refer to ESM for correct coolant for the model year vehicle that is being worked on.
6. Check the level of the CVT NS-2 Fluid and add as needed.
•
Refer to ESM for correct method to check fluid level for the model year vehicle that
is being worked on.
12/13
NTB14-002
PARTS INFORMATION
*
DESCRIPTION
SERVICE KIT-COOLER ASSY
PART #
B1606-JM01A
QUANTITY
1
NS-2 CVT Fluid
999MP-NS200P*
As needed
Order this item through the Nissan Maintenance Advantage program:
Phone: 877-NIS-NMA1 (877-647-6621). Website order via link on dealer portal
www.NNAnet.com and click on the “Maintenance Advantage” link
Table A
INDEX
1
PART NAME
COOLER ASSY-AUTO TRANS OIL (air-to-ATF cooler)
QTY PER
KIT
1
2
3
4
BRKT ASSY-O/COOLER, UPR
BRKT ASSY-O/COOLER, LWR
BRKT ASSY-O/COOLER, SIDE
1
1
1
5
TUBE-OIL COOLER
2
6
7
8
HOSE-AUTO TRANS, UPR
HOSE-AUTO TRANS, LWR
HOSE-AUTO TRANS, UPR (2)
1
1
1
9
HOSE-AUTO TRANS, LWR (2)
1
10
11
12
CLIP-TUBE (INSULATOR)
CLAMP-HOSE
BOLT-HEX,PP W/CON SPW
1
8
3
13
BOLT-HEX,PP W/CON SPW
4
14
14a
16
BOLT-HEX,PP W/CON SPW
NUT-HEX,PP W/CON SPW
NUT-HEX,PP W/CON SPW
2
2
2
18
OIL COOLER (CVT mounted heat exchanger with 4 ports)
1
19
OIL COOLER O-RING
1
20
Clip for lower seal
2
CLAIMS INFORMATION
Submit a Primary Part (PP) type line claim using the following claims coding:
DESCRIPTION
PFP
OP CODE SYM
DIA
FRT
Oil cooler kit installation
(1)
JX15AA
AE
32
1.5
(1) Refer to the electronic parts catalog (FAST) and use the Oil Cooler assembly part
number (21606 -*****) as the Primary Failed Part (PFP).
13/13
NTB14-002


© dot.report 2024

Use of this information constitutes acceptance for use in an AS IS condition. There are NO warranties, implied or otherwise, with regard to this information or its use. Any use of this information is at the user's risk. It is the responsibility of user to evaluate the accuracy, completeness or usefulness of any information, opinion, advice or other content. EACH USER WILL BE SOLELY RESPONSIBLE FOR ANY consequences of his or her direct or indirect use of this web site. ALL WARRANTIES OF ANY KIND ARE EXPRESSLY DISCLAIMED. This site will NOT BE LIABLE FOR ANY DIRECT, INDIRECT or any other kind of loss.