SIL 783

Service Bulletin Details

Public Details for: SIL 783

Structural cracking has been observed where the primary leveling cylinder mounting pin is welded to the lower boom side plate on ls 40/45/55 aerial devices. Failure of this connection could disable the hydraulic platform leveling system. Al


- 2015 - 2014 - 2013 - 2012 - 2011 - 2010 - 2009 - 2008 - 2007 - 2006 - 2005 - 2004 -

210 Inverness Center Parkway
Birmingham, AL 35242
Telephone: 205-991-7733
Facsimile: 205-991-9993
www.altec.com
This notice applies to your vehicle. See attached serial number list.
Dear Altec Owner,
January 29, 2021
Altec Industries, Inc. has developed a product improvement which relates to LS40/45/55 aerial devices built
from 2004 through 2015.
Refer to SIL 783 for the items covered under the warranty policy. Altec will supply the necessary parts to correct this condition free of charge.
In order to determine if your unit is affected by SIL 783, compare the serial number of your unit with the list
of affected units attached to the SIL. The product improvement can be performed by the customer or you may
contact Altec at 1-877-GO-ALTEC (1-877-462-5832) for further assistance.
At any time, you may contact Altec at 1-877 GO ALTEC (1-877-462-5832) with your unit’s serial number to
determine if there are any other outstanding notices.
If you have sold or retired the unit please call Altec at 1-877-GO-ALTEC (1-877-462-5832) so the records may
be changed.
We regret this inconvenience; however we are taking this action in the interest of your safety and continued
satisfaction with Altec products.
Thank you for your immediate attention on this important matter.
Altec Industries, Inc.
HiLine Operations
Duluth, MN
SIL 783
Service Information Letter
January 29, 2021
Units Affected: LS40/45/55 aerial devices built from 2004 through 2015 (Verify that your unit
serial number is affected by reviewing the attached list in this SIL or by accessing your fleet on
connect.altec.com/login)
Leveling Cylinder Update
Altec is committed to providing our customers safe and reliable products from initial delivery
throughout the useful life of the machine.
Some customers have reported structural cracking where the primary leveling cylinder mounting
pin is welded to the lower boom side plate. Failure of this connection could disable the hydraulic
platform leveling system. Altec has developed a kit to reduce the relief pressure of the hydraulic
leveling circuit. This will prevent damage to the leveling cylinder mounting pin weld joint by
reducing the weld stress. Altec has also developed a kit to repair the lower boom if the side plate
has cracked.
Altec requires the following actions to be completed on the affected units by the next annual
preventive maintenance interval or within one year of receipt of the SIL.
1. Call 1-877-GO ALTEC (1-877-462-5832) to order the Leveling Circuit Relief Kit, part number 991170986.
2. Inspect the primary leveling cylinder mounting pin attachment using the Inspection Procedure beginning on page 2.
3. If required by the inspection results, take the unit out of service until the leveling cylinder
mounting pin attachment has been repaired.
• If there is cracking in the weld but not the side plate, repair the unit according to the Leveling Cylinder Pin Weld Repair Procedure beginning on page 4 of the SIL.
• If there is cracking in both the weld and the side plate, call 1-877-GO ALTEC (1-877-4625832) to order the Leveling Cylinder Pin Repair Kit, part number 991082050. Repair the
weld and install the kit according to the instructions included in the kit.
4. Install the Leveling Circuit Relief Kit according to the instructions included the kit.
Inspection labor
Repair labor
Account #
Travel
NHTSA code
Prime fail P/N
Doc ref
Altec Use Only
0.5 hr
4.0 hr install relief kit
5.0 hr repair pin weld only
8.0 hr repair weld & install pin kit
010.1953.43151.000.9116.000
Not included
98
n/a
074900738, 074900739
Altec Use Only
Parts Kit
Part No.
Leveling circuit relief kit
991170986
Leveling cylinder pin repair kit
991082050
Page 1 of 5
Qty
1
1
Warranty
Yes
Yes
SIL 783
This inspection and repair are covered under the Altec Warranty Policy and can be performed by
Altec, the customer, or the customer’s warranty provider. Altec will perform the inspection and
repair for free at an Altec facility. Altec requires the Leveling Cylinder Pin Weld Repair Procedure and the Leveling Cylinder Pin Repair Kit installation to be performed by a welder qualified
to the AWS D1.1 Structural Welding Code. If the customer, or the customer’s warranty provider
performs the inspection and/or repair, a warranty claim must be submitted to be reimbursed for
the cost of the parts and/or labor. Altec will allow up to the amounts shown below for the labor
to perform this inspection and repair.
Allowable Labor Cost
$45
$360
$450
$720
Procedure
Inspection
Install Relief Kit
Repair Pin Weld Only
Repair Pin Weld and Install Pin Repair Kit
Call 1-877-GO ALTEC (1-877-462-5832) to schedule the work to be done by an Altec service
technician. Customers are responsible for the travel costs of an Altec Mobile Service technician
if the technician performs the inspection and/or the relief kit installation at the owner’s location.
An Altec Mobile Service technician is not able to perform the repairs requiring welding.
Inspection Procedure
A grinder, flashlight, and dye penetrant kit are required for the inspection. Read and understand
all steps of the instructions before beginning the procedure.
1. Position the unit on a level surface. Apply the parking brake and chock the wheels.
2. Find the primary leveling cylinder mounting pin located on the street side of the lower boom
(refer to Figure 1).
Mounting Pin
Lower Boom
Primary Leveling
Cylinder
Figure 1 — Locating Leveling Cylinder Mounting Pin
Page 2 of 5
SIL 783
3. Inspect the weld around the base of the
mounting pin between the 9 o’clock
and 12 o’clock positions (refer to Figure 2).
• If there is no visible cracking in the
paint and no rust on the surface, proceed to step 7a.
• If there is visible cracking in the
paint and/or rust on the surface, proceed to step 4.
12 O’Clock
Area to Inspect
9 O’Clock
4. Look inside the lower boom through
the base end with a flashlight and examine the surface of the left side plate
Figure 2 — Inspecting Weld
in the area where the mounting pin is
attached to the outside.
• If there is no visible cracking in the paint and no rust on the surface, proceed to step 5.
• If there is visible cracking in the paint and/or rust on the surface, proceed to step 7b.
5. Use a grinder to remove the weld all along the cracked portion and about 1/2” beyond each end
of the crack in the weld. Allow the boom to cool to the touch.
6. Use a dye penetrant kit to check for cracking in the side
plate.
• If the dye penetrant shows cracking in the side plate (refer to Figure 3), use a die grinder to grind a slight groove
along the length of the crack to mark it. Then proceed to
step 7b.
• If the dye penetrant does not show any cracking in the
side plate, proceed to step 7c.
7. Proceed with step a, b, or c based on the results of steps 3
through 6.
a. If step 3 showed no visible cracking or rust on the weld, Figure 3 — Cracking in Side Plate
return the unit to service until the Leveling Circuit Relief Kit is received. Then install the Leveling Circuit Relief Kit
b. If step 4 or step 6 showed cracking in the side plate, take the unit out of service. Order and
install the Leveling Cylinder Pin Repair Kit, part number 991082050. Return the unit to
service until the Leveling Circuit Relief Kit is received. Then install the Leveling Circuit
Relief Kit.
c. If step 3 showed evidence of cracking in the weld but steps 4 through 6 showed no cracking in the side plate, take the unit out of service. Perform the Leveling Cylinder Pin Weld
Repair Procedure beginning on page 4. Return the unit to service until the Leveling Circuit
Relief Kit is received. Then install the Leveling Circuit Relief Kit.
Page 3 of 5
SIL 783
Leveling Cylinder Pin Weld Repair Procedure
This procedure replaces the cracked weld that was removed during the Inspection Procedure.
The unit must be taken to an Altec facility, customer shop, or third party for repair by a welder
qualified to AWS D1.1 Structural Welding Code. The welder must be qualified in 3G uphill progression welding and use one of the following approved methods:
• FCAW-G - gas shielded flux core wire (E71T-1M/9M)
• FCAW-S - gasless self-shielded flux core wire (E71T-11)
• SMAW - stick electrode (E7018 H4R)
• GMAW - solid core wire (ER70S-6)
Matching paint is required for application after the welding is completed. Read and understand
all steps of the instructions before beginning the procedure.
1. Position the unit on a level surface. Apply the parking brake and chock the wheels.
2. Find the primary leveling cylinder
mounting pin located on the street side
of the lower boom (refer to Figure 4).
Mounting Pin
Lower Boom
Primary Leveling
Cylinder
3. Cover the hydraulic plumbing below
the cylinder with heat-resistant material such as fiberglass cloth to protect it
from weld spatter.
4. Sand off the paint and any corrosion
from the side plate and the pin OD
about 1/2” beyond where the weld was
removed during the Inspection Procedure.
5. Apply a 1/4” fillet weld to replace the
portion of weld that was removed (refer to
Figure 5). Blend the weld smoothly into
the original weld that was not removed.
Figure 4 — Locating Leveling Cylinder Mounting Pin
1/4
6. After the weld has cooled, clean the repaired area and paint it to match.
7. Remove the covering over the hydraulic
plumbing.
8. A structural test is required to verify structural soundness before putting the unit
back into service.
Figure 5 — Repairing Weld on Mounting Pin
(Cylinder and Plumbing not shown)
WARNING
Death or serious injury can result if the unit becomes unstable. Maintain stability of the unit while
performing a structural test by following proper procedures.
Page 4 of 5
SIL 783
9. The area where the test is performed must be level and free from any overhead obstructions.
Position the unit in the test area so the platform may be accessed by a forklift (or other lifting
device) to place the test weight.
10. Apply the parking brake and chock the wheels. Engage the unit’s hydraulic system.
11. For the test weight, use the platform capacity shown on the serial number placard. Do not
multiply the capacity by 1.5 for this test.
If the unit is equipped with a platform liner, deduct the weight of the liner from the test
weight figure.
NOTICE
Carefully load the test weight to prevent damage to the platform or liner.
12. Place the weight in the platform or place a sling around the platform to suspend the weight
directly under its centerline. Use a forklift (or other lifting device) to slowly apply the weight.
13 Leave the boom fully retracted.
14. Using the lower controls, articulate the boom from horizontal to the maximum boom angle
and back to horizontal a total of ten times.
15. Inspect the repaired weld and the surrounding area for any signs of damage. Make any necessary corrections.
16. Return the unit to service until the Leveling Circuit Relief Kit is received. Then install the
Leveling Circuit Relief Kit.
Page 5 of 5


© dot.report 2024

Use of this information constitutes acceptance for use in an AS IS condition. There are NO warranties, implied or otherwise, with regard to this information or its use. Any use of this information is at the user's risk. It is the responsibility of user to evaluate the accuracy, completeness or usefulness of any information, opinion, advice or other content. EACH USER WILL BE SOLELY RESPONSIBLE FOR ANY consequences of his or her direct or indirect use of this web site. ALL WARRANTIES OF ANY KIND ARE EXPRESSLY DISCLAIMED. This site will NOT BE LIABLE FOR ANY DIRECT, INDIRECT or any other kind of loss.